Difference between revisions of "Commissioning Run Plan"
From Hall A Wiki
(→Pre-beam Checklist) |
|||
Line 6: | Line 6: | ||
== Pre-beam Checklist == | == Pre-beam Checklist == | ||
+ | <b>Trigger Checkout</b> (Experts) | ||
+ | Checkout trigger timing | ||
+ | Checkout of EDTM (Barak Schmookler) | ||
+ | Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers | ||
+ | |||
+ | * This has been found to be a robust method for determining electronic deadtime in Hall C and we | ||
+ | should think about adding something similar for GMP. | ||
== Commissioning and Calibrations == | == Commissioning and Calibrations == | ||
=== Beamline === | === Beamline === |
Revision as of 15:42, 6 October 2014
For the Fall of 2014 assume:
- max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
- 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.
Pre-beam Checklist
Trigger Checkout (Experts)
Checkout trigger timing Checkout of EDTM (Barak Schmookler) Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers
- This has been found to be a robust method for determining electronic deadtime in Hall C and we
should think about adding something similar for GMP.