(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787 ** Follow th...)
 
Line 9: Line 9:
 
** The target operator is required to supervise the cryo-target.
 
** The target operator is required to supervise the cryo-target.
 
** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, P<sub>LHRS</sub>=1.1981 GeV,  Theta_HRS=22.83, Theta_calo=12.35
 
** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, P<sub>LHRS</sub>=1.1981 GeV,  Theta_HRS=22.83, Theta_calo=12.35
** Make sure to use the DVCS configuration for all runs.
+
** Make sure to use the <b>DVCS CODA configuration</b> for all runs (<b>even when taking single arm HRS data</b>).
 
** MCC will be in beam studies with the plan to begin restoration of beam to Halls A and D.  The goal is to have CW beam by late Swing shift or early Owl shift.
 
** MCC will be in beam studies with the plan to begin restoration of beam to Halls A and D.  The goal is to have CW beam by late Swing shift or early Owl shift.
 
** <b>If the techs have completed the magnet work and we have not already gone to beam permit, then we should return to beam permit.</b>
 
** <b>If the techs have completed the magnet work and we have not already gone to beam permit, then we should return to beam permit.</b>
 
** During this shift, the shift crew is needed to communicate with MCC as needed for updates and support of beam restoration to Hall A.
 
** During this shift, the shift crew is needed to communicate with MCC as needed for updates and support of beam restoration to Hall A.

Revision as of 16:04, 19 November 2014

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, technical staff should not be contacted by the shift crew - please call the RC first.
  • Instructions for this shift
    • The target operator is required to supervise the cryo-target.
    • Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=1.1981 GeV, Theta_HRS=22.83, Theta_calo=12.35
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
    • MCC will be in beam studies with the plan to begin restoration of beam to Halls A and D. The goal is to have CW beam by late Swing shift or early Owl shift.
    • If the techs have completed the magnet work and we have not already gone to beam permit, then we should return to beam permit.
    • During this shift, the shift crew is needed to communicate with MCC as needed for updates and support of beam restoration to Hall A.