Difference between revisions of "Thursday, July 23, 2015 1:00pm EDT"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
 
Line 44: Line 44:
 
* Engineering Overview [https://hallaweb.jlab.org/wiki/images/9/97/2015-07-23_Moller_External_MAG_review-V2.pdf pdf] - Ernie, Jason and Jim
 
* Engineering Overview [https://hallaweb.jlab.org/wiki/images/9/97/2015-07-23_Moller_External_MAG_review-V2.pdf pdf] - Ernie, Jason and Jim
 
** water flow low enough to avoid problems from erosion
 
** water flow low enough to avoid problems from erosion
**  
+
** why not multiple magnets? - Don't have a convincing reason of why not.
 
* Discussion
 
* Discussion
  

Latest revision as of 15:23, 23 July 2015

Last meeting: Wednesday, July 15, 2015 2:00pm EDT


Agenda




  • Project summary - KK
  • Spectrometer Overview pdf - Juliette
  • Engineering Overview pdf - Ernie, Jason and Jim
  • Discussion


External Advisory Group:

  • Dieter Walz (SLAC)
  • George Clark (TRIUMF)
  • Vladimir Kashikhin (Fermilab)
  • Steve Williamson (University of Illinois)


Internal Advisory Group:

  • Robin Wines (JLAB)
  • Al Gavalya (JLAB)
  • Jay Benesch (JLAB)
  • Roger Carlini (JLAB)
  • Stanley Kowalksi (MIT)
  • Kent Paschke (UVA)



BlueJeans Webpage

Minutes

Attending: Juliette, George, Steve, Kent, Jason, Jim, Ernie, KK, Vladimir, Javier, Jay, Dieter, Al, Seamus

  • Project summary - KK
    • Pre-R&D, not project engineering and design
    • preparing for technical feasibility (not cost and scheduling)
    • proof-of-principle concept
  • Spectrometer Overview pdf - Juliette
    • look at multiple coils failing at once; what happens to the forces?
  • Engineering Overview pdf - Ernie, Jason and Jim
    • water flow low enough to avoid problems from erosion
    • why not multiple magnets? - Don't have a convincing reason of why not.
  • Discussion




Return to Teleconferences
Return to MOLLER at 11 GeV E09-005