Difference between revisions of "Wednesday, Mar. 02: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
Line 14: Line 14:
 
<b>Upcoming event(Short Term)</b>
 
<b>Upcoming event(Short Term)</b>
 
* Note: MCC RF recovery (8:30-11:30AM, Thursday)
 
* Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access)
+
Access Wish List:(controlled access)<br>
1/ Series of magnet measurement <: 30min/ no beam/ but beam permit
+
1/ Series of magnet measurement <: 30min/ no beam/ but beam permit<br>
2/ Andrew Lumanog (327-5523) : <1hr
+
2/ Andrew Lumanog (327-5523) : <1hr<br>
3/ Compton : check laser profile : <1hr
+
3/ Compton : check laser profile : <1hr<br>
  
 
* Detailed Plan [https://hallaweb.jlab.org/ here]
 
* Detailed Plan [https://hallaweb.jlab.org/ here]

Revision as of 13:39, 2 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations
  • BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
  • Need shift crews for future


Specific mission

  • Production Run
  • Set up the beam through Compton chicane


Upcoming event(Short Term)

  • Note: MCC RF recovery (8:30-11:30AM, Thursday)

Access Wish List:(controlled access)
1/ Series of magnet measurement <: 30min/ no beam/ but beam permit
2/ Andrew Lumanog (327-5523) : <1hr
3/ Compton : check laser profile : <1hr


Upcoming event(Long Term)

  • BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
  • Target boiling test 30uA(60 ideal)
  • Detailed instructions

BCM DOC1DOC2


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++