− | + | <b>General considerations</b> | |
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | * BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | ||
* Need shift crews for future | * Need shift crews for future | ||
Line 7: | Line 7: | ||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * <b>Production Run</b> | + | * <b><u>Production Run</u></b> |
* Set up the beam through Compton chicane | * Set up the beam through Compton chicane | ||
Revision as of 13:41, 2 March 2016
Go back to Daily Run Plan Daily Run Plans General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Set up the beam through Compton chicane
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access)
1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit
2/ Andrew Lumanog: (Call 327-5523) : <1hr
3/ Dave/Greg: check Compton laser profile : <1hr
- Detailed Plan here
Upcoming event(Long Term)
- BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
- Target boiling test 30uA(60 ideal)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++