Difference between revisions of "Wednesday, Mar. 02: SWING Shift"
From Hall A Wiki
Line 9: | Line 9: | ||
* <b><u>Production Run</u></b> | * <b><u>Production Run</u></b> | ||
* Set up the beam through Compton chicane | * Set up the beam through Compton chicane | ||
+ | |||
+ | |||
<b>Current Issues</b> | <b>Current Issues</b> | ||
* BPM issue HALOG:https://logbooks.jlab.org/entry/3386795 | * BPM issue HALOG:https://logbooks.jlab.org/entry/3386795 | ||
+ | |||
+ | |||
<b>Upcoming event(Short Term)</b> | <b>Upcoming event(Short Term)</b> |
Revision as of 14:09, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Set up the beam through Compton chicane
Current Issues
- BPM issue HALOG:https://logbooks.jlab.org/entry/3386795
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access)
1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit
2/ Andrew Lumanog: (Call 327-5523) : <1hr
3/ Dave/Greg: check Compton laser profile : <1hr
- Detailed Plan here
Upcoming event(Long Term)
- BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
- Target boiling test 30uA(60 ideal)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++