Go back to Daily Run Plan [[Daily Run Plans]]
+
Go back to Daily Run Plan [[Daily Run Plans]]<br><br>
* General considerations
+
<b>General considerations</b>
**  
+
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
 +
* Need shift crews for future
 +
 
 +
 
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>
* Note1: Production Run
+
* <b><u>Production Run</u></b>
* Set up the beam through Compton chicane
+
* Set up the beam without Compton chicane
  
* Detailed instructions [https://hallaweb.jlab.org/ here]
 
  
<b>Upcoming event</b>
 
* Note: MCC RF recovery (8:30-11:30AM, Thursday)
 
Access Wish List:(controlled access)
 
1/ Series of magnet measurement <: 30min/ no beam/ but beam permit
 
2/ Andrew Lumanog (327-5523) : <1hr
 
3/ Compton : check laser profile : <1hr
 
  
 +
<b>Current Issues</b>
 +
* BPM issue HALOG:https://logbooks.jlab.org/entry/3386795
 +
 +
 +
 +
<b>Upcoming event(Short Term)</b>
 +
* Note: MCC RF recovery (8:30-11:30AM, Thursday)
 +
Access Wish List:(controlled access)<br>
 +
1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit<br>
 +
2/ Andrew Lumanog: (Call 327-5523) : <1hr<br>
 +
3/ Dave/Greg: check Compton laser profile : <1hr<br>
  
 
* Detailed Plan [https://hallaweb.jlab.org/ here]
 
* Detailed Plan [https://hallaweb.jlab.org/ here]
 +
 +
 +
 +
<b>Upcoming event(Long Term)</b>
 +
* BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible tomorrow ??))
 +
* Target boiling test 30uA(60 ideal)
 +
 +
* Detailed instructions
 +
BCM [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 +
  
  

Latest revision as of 17:52, 2 March 2016

Go back to Daily Run Plan Daily Run Plans

General considerations

  • BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
  • Need shift crews for future


Specific mission

  • Production Run
  • Set up the beam without Compton chicane


Current Issues


Upcoming event(Short Term)

  • Note: MCC RF recovery (8:30-11:30AM, Thursday)

Access Wish List:(controlled access)
1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit
2/ Andrew Lumanog: (Call 327-5523) : <1hr
3/ Dave/Greg: check Compton laser profile : <1hr


Upcoming event(Long Term)

  • BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible tomorrow ??))
  • Target boiling test 30uA(60 ideal)
  • Detailed instructions

BCM DOC1DOC2


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++