Difference between revisions of "Wednesday, Mar. 02: SWING Shift"
From Hall A Wiki
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Go back to Daily Run Plan [[Daily Run Plans]] | + | Go back to Daily Run Plan [[Daily Run Plans]]<br><br> |
− | + | <b>General considerations</b> | |
− | ** | + | * BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG |
+ | * Need shift crews for future | ||
+ | |||
+ | |||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * | + | * <b><u>Production Run</u></b> |
− | * Set up the beam | + | * Set up the beam without Compton chicane |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | <b>Current Issues</b> | ||
+ | * BPM issue HALOG:https://logbooks.jlab.org/entry/3386795 | ||
+ | |||
+ | |||
+ | |||
+ | <b>Upcoming event(Short Term)</b> | ||
+ | * Note: MCC RF recovery (8:30-11:30AM, Thursday) | ||
+ | Access Wish List:(controlled access)<br> | ||
+ | 1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit<br> | ||
+ | 2/ Andrew Lumanog: (Call 327-5523) : <1hr<br> | ||
+ | 3/ Dave/Greg: check Compton laser profile : <1hr<br> | ||
* Detailed Plan [https://hallaweb.jlab.org/ here] | * Detailed Plan [https://hallaweb.jlab.org/ here] | ||
+ | |||
+ | |||
+ | |||
+ | <b>Upcoming event(Long Term)</b> | ||
+ | * BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible tomorrow ??)) | ||
+ | * Target boiling test 30uA(60 ideal) | ||
+ | |||
+ | * Detailed instructions | ||
+ | BCM [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] | ||
+ | |||
Latest revision as of 17:52, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Set up the beam without Compton chicane
Current Issues
- BPM issue HALOG:https://logbooks.jlab.org/entry/3386795
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access)
1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit
2/ Andrew Lumanog: (Call 327-5523) : <1hr
3/ Dave/Greg: check Compton laser profile : <1hr
- Detailed Plan here
Upcoming event(Long Term)
- BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible tomorrow ??))
- Target boiling test 30uA(60 ideal)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++