Difference between revisions of "Wednesday, Mar. 02: SWING Shift"
From Hall A Wiki
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Go back to Daily Run Plan [[Daily Run Plans]] | + | Go back to Daily Run Plan [[Daily Run Plans]]<br><br> |
− | + | <b>General considerations</b> | |
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | * BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | ||
* Need shift crews for future | * Need shift crews for future | ||
Line 7: | Line 7: | ||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * <b>Production Run</b> | + | * <b><u>Production Run</u></b> |
− | * Set up the beam | + | * Set up the beam without Compton chicane |
+ | |||
+ | |||
+ | |||
+ | <b>Current Issues</b> | ||
+ | * BPM issue HALOG:https://logbooks.jlab.org/entry/3386795 | ||
Line 14: | Line 19: | ||
<b>Upcoming event(Short Term)</b> | <b>Upcoming event(Short Term)</b> | ||
* Note: MCC RF recovery (8:30-11:30AM, Thursday) | * Note: MCC RF recovery (8:30-11:30AM, Thursday) | ||
− | Access Wish List:(controlled access) | + | Access Wish List:(controlled access)<br> |
− | 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit | + | 1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit<br> |
− | 2/ Andrew Lumanog (327-5523) : <1hr | + | 2/ Andrew Lumanog: (Call 327-5523) : <1hr<br> |
− | 3/ | + | 3/ Dave/Greg: check Compton laser profile : <1hr<br> |
* Detailed Plan [https://hallaweb.jlab.org/ here] | * Detailed Plan [https://hallaweb.jlab.org/ here] | ||
Line 24: | Line 29: | ||
<b>Upcoming event(Long Term)</b> | <b>Upcoming event(Long Term)</b> | ||
− | * BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible | + | * BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible tomorrow ??)) |
* Target boiling test 30uA(60 ideal) | * Target boiling test 30uA(60 ideal) | ||
Latest revision as of 17:52, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Set up the beam without Compton chicane
Current Issues
- BPM issue HALOG:https://logbooks.jlab.org/entry/3386795
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access)
1/ Doug: Series of magnet measurement <: 30min/ no beam/ but beam permit
2/ Andrew Lumanog: (Call 327-5523) : <1hr
3/ Dave/Greg: check Compton laser profile : <1hr
- Detailed Plan here
Upcoming event(Long Term)
- BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible tomorrow ??))
- Target boiling test 30uA(60 ideal)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++