Difference between revisions of "Friday, Mar. 04: DAY Shift"
From Hall A Wiki
Line 14: | Line 14: | ||
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)<br> | 1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)<br> | ||
- Crucial: high beam current 30uA(at least try) with FC & empty target <br> | - Crucial: high beam current 30uA(at least try) with FC & empty target <br> | ||
+ | - Experts on call (Julie)<br> | ||
+ | - Calo. HV off<br> | ||
Instruction: | Instruction: | ||
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] | [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] | ||
<br> | <br> | ||
− | |||
− | |||
2/ Back to production mode | 2/ Back to production mode |
Revision as of 09:54, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Set up beam through Compton chicane
- Production runs (YES!!)
Specific mission
- Note:
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)
- Crucial: high beam current 30uA(at least try) with FC & empty target
- Experts on call (Julie)
- Calo. HV off
2/ Back to production mode
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++