Difference between revisions of "Friday, Mar. 04: SWING Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * BCM calibration ( ) <b>Specific mission</b> * Note: 1/ Back to production mode <b>Weekend Plan</b> * Note: 1/ P...) |
|||
Line 12: | Line 12: | ||
* Note: | * Note: | ||
1/ Back to production mode | 1/ Back to production mode | ||
+ | |||
+ | |||
+ | |||
+ | |||
<b>Weekend Plan</b> | <b>Weekend Plan</b> |
Revision as of 09:55, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- BCM calibration ( )
Specific mission
- Note:
1/ Back to production mode
Weekend Plan
- Note:
1/ Production data
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++