Difference between revisions of "Friday, Mar. 04: DAY Shift"
From Hall A Wiki
Line 17: | Line 17: | ||
- Calo. HV off<br> | - Calo. HV off<br> | ||
10:50AM (snap shot of BCM) | 10:50AM (snap shot of BCM) | ||
− | [[Image:BCM_snapshot_03042016_1050am.png | + | [[Image:BCM_snapshot_03042016_1050am.png|frame|hac BCM average]] |
Instruction: | Instruction: |
Revision as of 11:57, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Set up beam through Compton chicane
- Production runs (YES!!)
Specific mission
- Note:
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)
- Crucial: high beam current 30uA(at least try) with FC & empty target
- Experts on call (Julie)
- Calo. HV off
10:50AM (snap shot of BCM)
2/ Back to production mode
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++