Difference between revisions of "Friday, Mar. 04: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
Line 16: Line 16:
 
  - Experts on call (Julie)<br>
 
  - Experts on call (Julie)<br>
 
  - Calo. HV off<br>
 
  - Calo. HV off<br>
  - Instruction: <br>
+
  - Instruction:  
 
   [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 
   [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
  

Revision as of 12:00, 4 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane
  • Production runs (YES!!)



Specific mission

  • Note:

1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)

- Crucial: high beam current 30uA(at least try) with FC & empty target 
- Experts on call (Julie)
- Calo. HV off
- Instruction: DOC1DOC2

10:50AM (snap shot of BCM)
Image: hac_bcm_average


2/ Back to production mode


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++