Difference between revisions of "Friday, Mar. 04: DAY Shift"
From Hall A Wiki
Line 21: | Line 21: | ||
10:50AM (snap shot of BCM)<br> | 10:50AM (snap shot of BCM)<br> | ||
[[Image:BCM_snapshot_03042016_1050am.png|300px|Image: hac_bcm_average]] | [[Image:BCM_snapshot_03042016_1050am.png|300px|Image: hac_bcm_average]] | ||
− | + | 11:00AM Complete mission of BCM<br> | |
+ | HALOG:[]<br> | ||
2/ Back to production mode | 2/ Back to production mode |
Revision as of 12:12, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Set up beam through Compton chicane
- Production runs (YES!!)
Specific mission
- Note:
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)
- Crucial: high beam current 30uA(at least try) with FC & empty target
- Experts on call (Julie)
- Calo. HV off
- Instruction: DOC1DOC2
10:50AM (snap shot of BCM)
11:00AM Complete mission of BCM
HALOG:[]
2/ Back to production mode
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++