Difference between revisions of "Friday, Mar. 04: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
Line 25: Line 25:
  
  
2/ Back to production mode
+
2/ Back to production mode (11:30AM)
 
  - 15uA through Compton chicane<br>
 
  - 15uA through Compton chicane<br>
 
  - LH2 target<br>
 
  - LH2 target<br>
Line 31: Line 31:
 
  - LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br>
 
  - LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br>
 
  - PreScaleR : PS1=PS2=PS3=1, && PS8=200<br>
 
  - PreScaleR : PS1=PS2=PS3=1, && PS8=200<br>
  - PreScaleL : PS9 =1, + DVCS config.<br>
+
  - PreScaleL : PS9 =1, + DVCS config.
 
   
 
   
  

Revision as of 12:31, 4 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane
  • Production runs (YES!!)



Specific mission

  • Note:

1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)

- Crucial: high beam current 30uA(at least try) with FC & empty target 
- Experts on call (Julie)
- Calo. HV off
- Instruction: DOC1DOC2

10:50AM (snap shot of BCM)
Image: hac_bcm_average
11:00AM Complete mission of BCM
HALOG:[]


2/ Back to production mode (11:30AM)

- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++