Difference between revisions of "Friday, Mar. 04: SWING Shift"
From Hall A Wiki
Line 20: | Line 20: | ||
* Note: | * Note: | ||
1/ Production data | 1/ Production data | ||
+ | - 15uA through Compton chicane<br> | ||
+ | - LH2 target<br> | ||
+ | - DVCS ON<br> | ||
+ | - LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br> | ||
+ | - PreScaleR : PS1=PS2=PS3=1, && PS8=200<br> | ||
+ | - PreScaleL : PS9 =1, + DVCS config. | ||
+ | |||
+ | |||
Revision as of 12:42, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- BCM calibration ( YES !!)
Specific mission
- Note:
1/ Back to production mode
Weekend Plan
- Note:
1/ Production data
- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++