Difference between revisions of "Friday, Mar. 04: SWING Shift"
From Hall A Wiki
(One intermediate revision by the same user not shown) | |||
Line 12: | Line 12: | ||
* Note: | * Note: | ||
1/ Back to production mode | 1/ Back to production mode | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
- 15uA through Compton chicane<br> | - 15uA through Compton chicane<br> | ||
- LH2 target<br> | - LH2 target<br> | ||
Line 27: | Line 19: | ||
- PreScaleL : PS9 =1, + DVCS config. | - PreScaleL : PS9 =1, + DVCS config. | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | <b>Weekend Plan</b> | ||
+ | * Note: | ||
+ | 1/ continue production data | ||
+ | |||
Line 35: | Line 35: | ||
* Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++ | * Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++ | ||
− | + | * [https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.] |
Latest revision as of 16:25, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- BCM calibration ( YES !!)
Specific mission
- Note:
1/ Back to production mode
- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
Weekend Plan
- Note:
1/ continue production data
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++