Difference between revisions of "Todo List"

From Hall A Wiki
Jump to: navigation, search
(Spin Flip)
(Spin Flip)
Line 31: Line 31:
 
# Test plan (Yi/Jin)
 
# Test plan (Yi/Jin)
 
# EPICS communication (Jin)
 
# EPICS communication (Jin)
# Stepper Motor Commisioning (Jin)
+
# Stepper Motor Commisioning (Jin) {{Pass|Motor #1,3,4 Commisioned}} {{Warning|Motor #2 Unstable}}
 
# NMR Signal Acquisition (Yi)
 
# NMR Signal Acquisition (Yi)
 
# 2nd Copy of Spin Signal (Jin)
 
# 2nd Copy of Spin Signal (Jin)

Revision as of 23:39, 3 October 2008

Laser System

  1. Assemble COMET Lasers (Chiranjib/Yi)
  2. Move in a Rack to new target lab for COMET Lasers
  3. Interlock connections to Lasers (Mark/Yi)
  4. Interlock connections in the Hall (Mark/Yi)
  5. RTDs for Laser enclosure (Done by Yi'/Yi)
  6. RTDs to readout chassis for interlock (Yi')
  7. optics setup (Done by Chiranjib/Jin)
  8. Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
  9. Camera (Jin)
  10. Spectrum analyzer (Yi)
  11. Q-wave plate stepping motor (Jin)

Oven and Heater

  1. Heater Installation (Joe)
  2. Heater Control Box and connection (Joe)
  3. Oven temperature control RTD (Yi')
  4. RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)

NMR System

  1. Longitudinal RF Coil Connection (Yi')
  2. Pickup Coil Cables (Chiranjib/Yi')
  3. VI update (Jin/Yi)
  4. NMR Lock-in repair (Yi)

EPR System

  1. EPR D2 assembly (Chiranjib/Yi)
  2. EPR RF Cable (Chiranjib/Yi')

Spin Flip

  1. Test plan (Yi/Jin)
  2. EPICS communication (Jin)
  3. Stepper Motor Commisioning (Jin) Motor #1,3,4 Commisioned Motor #2 Unstable
  4. NMR Signal Acquisition (Yi)
  5. 2nd Copy of Spin Signal (Jin)
  6. VI update (Yi/Jin)
  7. Finish up Documentation (Yi/Jin)
  8. Target Worker Quick Training Material (Yi/Jin)

Holding Field

  1. Optimal Field determination (Yi')
  2. Correction Field Calculation (Yi')
  3. Correction Coil connection (Chiranjib/Yi')

Cell Installation

  1. Reference Cell (Joe/Todd)
  2. He3 Cell (Joe)