*** Julie note from Beam Team Meeting at 1:30PM, Mar.8, 2016 at MCC.
+
Go back to Daily Run Plan [[Daily Run Plans]]
 +
 
 +
** Julie note from Beam Team Meeting at 1:30PM, Mar.8, 2016 at MCC.
  
 
* <b>Purpose</b>: Plans to run at 60uA
 
* <b>Purpose</b>: Plans to run at 60uA
Line 23: Line 25:
 
  - 2/ High current 60 uA should be deliverable for calibration and production both 4pass and 5pass
 
  - 2/ High current 60 uA should be deliverable for calibration and production both 4pass and 5pass
  
* <b>Concluded Plan</b>: Try 60 uA Thursday morning up to noon
+
* <b>Concluded Plan</b>:
 +
- Try 60 uA Thursday morning up to noon

Latest revision as of 18:07, 8 March 2016

Go back to Daily Run Plan Daily Run Plans

    • Julie note from Beam Team Meeting at 1:30PM, Mar.8, 2016 at MCC.
  • Purpose: Plans to run at 60uA
  • Current issues:
- There is no consensus on why the beam is limited at 30 uA. 
  • Ideas:
- 1/ The limitation is in the injector 
- 2/ In the RF separator
  • Attempt:
- 1/ Removing/Changing Wien filter (horizontal-> vertical) ??
- 2/ Run with a magnetic separation ??
  • Problem foresee:
- 1/  ?? 
- 2/ Compatible with Hall D taking data
  • GMp expert inform:
- 1/ Polarization is not matter
- 2/ High current 60 uA should be deliverable for calibration and production both 4pass and 5pass
  • Concluded Plan:
- Try 60 uA Thursday morning up to noon