Difference between revisions of "Todo List"

From Hall A Wiki
Jump to: navigation, search
(EPICS & DAQ)
Line 9: Line 9:
 
# {{pass|Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)}}
 
# {{pass|Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)}}
 
# Camera (Jin) Aborted
 
# Camera (Jin) Aborted
# Spectrum analyzer (Yi)
+
# {{pass|Spectrum analyzer (Yi)}}
 
# {{pass|Q-wave plate stepping motor (Jin)}}
 
# {{pass|Q-wave plate stepping motor (Jin)}}
  
Line 26: Line 26:
 
== EPR System ==
 
== EPR System ==
 
# EPR D2 assembly (Chiranjib/Yi)
 
# EPR D2 assembly (Chiranjib/Yi)
# EPR RF Cable (Chiranjib/Yi')
+
# {{pass|EPR RF Cable (Chiranjib/Yi')}}
  
 
== Spin Flip ==
 
== Spin Flip ==
Line 32: Line 32:
 
# {{Pass|EPICS communication (Jin)}}
 
# {{Pass|EPICS communication (Jin)}}
 
# {{Pass|Stepper Motor Commisioning (Jin)}}
 
# {{Pass|Stepper Motor Commisioning (Jin)}}
# NMR Signal Acquisition (Yi/Jin/Chiranjib)
+
# {{pass|NMR Signal Acquisition (Yi/Jin/Chiranjib)}}
 
# {{Pass|2nd Copy of Spin Signal (Jin)}}
 
# {{Pass|2nd Copy of Spin Signal (Jin)}}
 
# VI update (Yi/Jin)
 
# VI update (Yi/Jin)

Revision as of 08:49, 17 October 2008

Laser System

  1. Assemble COMET Lasers (Chiranjib/Yi)
  2. Move in a Rack to new target lab for COMET Lasers
  3. Interlock connections to Lasers (Mark/Yi)
  4. Interlock connections in the Hall (Mark/Yi)
  5. RTDs for Laser enclosure (Done by Yi'/Yi)
  6. RTDs to readout chassis for interlock (Yi')
  7. optics setup (Done by Chiranjib/Jin)
  8. Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
  9. Camera (Jin) Aborted
  10. Spectrum analyzer (Yi)
  11. Q-wave plate stepping motor (Jin)

Oven and Heater

  1. Heater Installation (Joe)
  2. Heater Control Box and connection (Joe)
  3. Oven temperature control RTD (Yi')
  4. RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)

NMR System

  1. Longitudinal RF Coil Connection (Yi')
  2. Pickup Coil Cables (Chiranjib/Yi')
  3. VI update (Jin/Yi)
  4. NMR Lock-in repair (Yi)

EPR System

  1. EPR D2 assembly (Chiranjib/Yi)
  2. EPR RF Cable (Chiranjib/Yi')

Spin Flip

  1. Test plan (Yi/Jin)
  2. EPICS communication (Jin)
  3. Stepper Motor Commisioning (Jin)
  4. NMR Signal Acquisition (Yi/Jin/Chiranjib)
  5. 2nd Copy of Spin Signal (Jin)
  6. VI update (Yi/Jin)
  7. Finish up Documentation (Yi/Jin)
  8. Target Worker Quick Training Material (Yi/Jin)

EPICS & DAQ

  1. Target IOC (Jack/Bryan/Yi/Jin)
  2. Targe EPICS Variable to Data Stream (Yi/Jin)
  3. Analyzer code for target state (Jin)

Holding Field

  1. Optimal Field determination (Yi')
  2. Correction Field Calculation (Yi')
  3. Correction Coil connection (Chiranjib/Yi')

Cell Installation

  1. Reference Cell (Joe/Todd)
  2. He3 Cell (Joe)