Difference between revisions of "MOLLER Pion Background Meeting Thursday, September 22, 2016 3:00pm EST"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 19: Line 19:
 
** To be placed behind Moller ring to begin with.
 
** To be placed behind Moller ring to begin with.
 
** Lead tungstate(PbWO_4) blocks.
 
** Lead tungstate(PbWO_4) blocks.
** Wouter's initial concept of the pion detector geometry.
+
** Wouter's initial concept of the pion detector geometry. (See image below)
<gallary mode='packed-overlay'>
+
Image:MOLLER_Pion_DetectorAssemblyConcept.png|thumb|left|Initial pion detector geometry concept.
+
</gallary>
+
 
* Any new business?
 
* Any new business?
 +
[[Image:MOLLER_Pion_DetectorAssemblyConcept.png|thumb|left|Initial pion detector geometry concept.]]
  
 
=Minutes=
 
=Minutes=

Revision as of 14:44, 20 September 2016

MOLLER wiki home:MOLLER_at_11_GeV_E09-005

Previous Meeting: MOLLER_Pion_Background_Meeting_Thursday,_September_15,_2016_3:00pm_EST

Meeting Information

BlueJeans Call Information

URL: https://bluejeans.com/624029893

Phone Number: 1-800-240-2560

Meeting ID: 624029893

Agenda

  • Scott: Implementation of lead wall and strawman pion detector. WM ELOG Pion sim 67
  • Jacob: Starting to work on pion simulations.
  • Initial plan: Implement single septant pion detector behind lead wall.
    • To be placed behind Moller ring to begin with.
    • Lead tungstate(PbWO_4) blocks.
    • Wouter's initial concept of the pion detector geometry. (See image below)
  • Any new business?
Initial pion detector geometry concept.

Minutes

Attendees:

Not Attending:

Scribe: Kurtis