Difference between revisions of "MOLLER Pion Background Meeting Thursday, September 22, 2016 3:00pm EST"

From Hall A Wiki
Jump to: navigation, search
(New page: Previous Meeting: Thursday,_September_15,_2016_3:00pm_EST =Meeting Information= BlueJeans Call Information URL: https://bluejeans.com/624029893 Phone Number: 1-800-240-2560 Mee...)
 
(Minutes)
 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
Previous Meeting: [[Thursday%2C_September_15%2C_2016_3:00pm_EST]]
+
MOLLER wiki home:[[MOLLER_at_11_GeV_E09-005]]
 +
 
 +
Previous Meeting: [[MOLLER_Pion_Background_Meeting_Thursday%2C_September_15%2C_2016_3:00pm_EST]]
 
=Meeting Information=
 
=Meeting Information=
  
Line 12: Line 14:
 
=Agenda=
 
=Agenda=
  
* Scott: Implementation of lead wall and strawman pion detector.
+
* Scott: Implementation of lead wall and strawman pion detector. [http://dilbert.physics.wm.edu/MOLLER+Simulation/67 WM ELOG Pion sim 67]
 
* Jacob: Starting to work on pion simulations.
 
* Jacob: Starting to work on pion simulations.
 
* Initial plan: Implement single septant pion detector behind lead wall.
 
* Initial plan: Implement single septant pion detector behind lead wall.
 
** To be placed behind Moller ring to begin with.
 
** To be placed behind Moller ring to begin with.
 
** Lead tungstate(PbWO_4) blocks.
 
** Lead tungstate(PbWO_4) blocks.
 +
** Wouter's initial concept of the pion detector geometry. (See image below)
 
* Any new business?
 
* Any new business?
 +
[[Image:MOLLER_Pion_DetectorAssemblyConcept.png|thumb|left|Initial pion detector geometry concept.]]
  
 
=Minutes=
 
=Minutes=
  
Attendees:  
+
Attendees: Kurtis, Mark P., Seamus
  
Not Attending:  
+
Not Attending: David, Wouter, Scott, Jacob, KK, Rakitha
  
 
Scribe: Kurtis
 
Scribe: Kurtis
 +
 +
*Based on the need for this meeting to become weekly, many people have found this time inconvenient. So I will be sending around a Doodle poll to find a new meeting time.
 +
 +
*Mark P. mentioned that the original MIE proposal budget was large enough to include a six septant coverage with additional GEM planes for neutral identification/rejection at least for the Moller detection region.
 +
 +
*More thought is required to really determine if we need full phi coverage or is a reduced number of pion detectors will suffice.
 +
 +
*What Pi-/e- ratio do we need?
 +
** This is the driving question that will effect the cost of the lead wall for the upcoming Directors's budget review.
 +
** Scott's summer simulation results have been used to determine an initial pi-/e- ratio. He has already done simulations using the Wiser pion and Moller generators from 10 to 300 mm of lead wall thickness. At 250 mm, we see about a 1:1 pi-/e- ratio. New simulations are required beyond 250/300 mm to accurately determine a pi-/e- ratio greater than 1:1.

Latest revision as of 15:38, 22 September 2016

MOLLER wiki home:MOLLER_at_11_GeV_E09-005

Previous Meeting: MOLLER_Pion_Background_Meeting_Thursday,_September_15,_2016_3:00pm_EST

Meeting Information

BlueJeans Call Information

URL: https://bluejeans.com/624029893

Phone Number: 1-800-240-2560

Meeting ID: 624029893

Agenda

  • Scott: Implementation of lead wall and strawman pion detector. WM ELOG Pion sim 67
  • Jacob: Starting to work on pion simulations.
  • Initial plan: Implement single septant pion detector behind lead wall.
    • To be placed behind Moller ring to begin with.
    • Lead tungstate(PbWO_4) blocks.
    • Wouter's initial concept of the pion detector geometry. (See image below)
  • Any new business?
Initial pion detector geometry concept.

Minutes

Attendees: Kurtis, Mark P., Seamus

Not Attending: David, Wouter, Scott, Jacob, KK, Rakitha

Scribe: Kurtis

  • Based on the need for this meeting to become weekly, many people have found this time inconvenient. So I will be sending around a Doodle poll to find a new meeting time.
  • Mark P. mentioned that the original MIE proposal budget was large enough to include a six septant coverage with additional GEM planes for neutral identification/rejection at least for the Moller detection region.
  • More thought is required to really determine if we need full phi coverage or is a reduced number of pion detectors will suffice.
  • What Pi-/e- ratio do we need?
    • This is the driving question that will effect the cost of the lead wall for the upcoming Directors's budget review.
    • Scott's summer simulation results have been used to determine an initial pi-/e- ratio. He has already done simulations using the Wiser pion and Moller generators from 10 to 300 mm of lead wall thickness. At 250 mm, we see about a 1:1 pi-/e- ratio. New simulations are required beyond 250/300 mm to accurately determine a pi-/e- ratio greater than 1:1.