Line 36: Line 36:
  
 
== Oven and Heater ==
 
== Oven and Heater ==
# Heater Installation (Joe)
+
# {{pass|Heater Installation (Joe)}}
# Heater Control Box and connection (Joe)
+
# {{pass|Heater Control Box and connection (Joe)}}
 
# {{pass|Oven temperature control RTD (Yi')}}
 
# {{pass|Oven temperature control RTD (Yi')}}
 
# {{pass|RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)}}
 
# {{pass|RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)}}
Line 48: Line 48:
  
 
== EPR System ==
 
== EPR System ==
# EPR D2 assembly (Chiranjib/Yi)
+
# {{pass|EPR D2 assembly (Chiranjib/Yi)}}
 
# {{pass|EPR RF Cable (Chiranjib/Yi')}}
 
# {{pass|EPR RF Cable (Chiranjib/Yi')}}
  
Line 62: Line 62:
  
 
== EPICS & DAQ ==
 
== EPICS & DAQ ==
# Target IOC (Jack/Bryan/Yi/Jin)
+
# {{pass|Target IOC (Jack/Bryan/Yi/Jin)}}
 
# {{Pass|Targe EPICS Variable to Data Stream (Yi/Jin)}}
 
# {{Pass|Targe EPICS Variable to Data Stream (Yi/Jin)}}
 
# {{Pass|Analyzer code for target state (Jin)}}
 
# {{Pass|Analyzer code for target state (Jin)}}
Line 69: Line 69:
 
# Optimal Field determination (Yi')
 
# Optimal Field determination (Yi')
 
# Correction Field Calculation (Yi')
 
# Correction Field Calculation (Yi')
# Correction Coil connection (Chiranjib/Yi')
+
# {{pass|Correction Coil connection (Chiranjib/Yi')}}
  
 
== Cell Installation ==
 
== Cell Installation ==
 
# {{pass|Reference Cell (Joe/Todd)}}
 
# {{pass|Reference Cell (Joe/Todd)}}
# He3 Cell (Joe)
+
# {{pass|He3 Cell (Joe)}}

Revision as of 13:31, 26 October 2008

10/18 rebuild

Yi++=Yi Qiang + ALL

  1. Ladder (Ed)
  2. Limit Switch EPICS programming (Pam)
  3. Heater Line (Ed/Joe/Scot)
  4. Enclosure (Ed)
  5. Ref Cell (Joe/Scot)
  6. Water Calib (Yi++) aborted...
  7. Adjust pickup coils on pumping chamber (Jin/Yi/Chiranjib)
  8. Test Heater / Oven (Joe/Yi)
  9. Mounting He3 Cell (Yi++)
  10. Heating Cell (Yi++)
  11. Laser Alignment Full Power (Yi, Chiranjib, JP)
  12. Spin Up (Yi++)
  13. Spin Flip Test (Jin)
  14. EPR Alignment (Yi++)
  15. Cross Calib Temp. Test (Yi++)
  16. Comet Laser (Yi++)
  17. EPICS Control (EPICS Grp)
  18. TO Training Preparation (Yi/Chiranjib/Jin)

Laser System

  1. Assemble COMET Lasers (Chiranjib/Yi)
  2. Move in a Rack to new target lab for COMET Lasers
  3. Interlock connections to Lasers (Mark/Yi)
  4. Interlock connections in the Hall (Mark/Yi)
  5. RTDs for Laser enclosure (Done by Yi'/Yi)
  6. RTDs to readout chassis for interlock (Yi')
  7. optics setup (Done by Chiranjib/Jin)
  8. Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
  9. Camera (Jin) aborted
  10. Spectrum analyzer (Yi)
  11. Q-wave plate stepping motor (Jin)

Oven and Heater

  1. Heater Installation (Joe)
  2. Heater Control Box and connection (Joe)
  3. Oven temperature control RTD (Yi')
  4. RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)

NMR System

  1. Longitudinal RF Coil Connection (Yi')
  2. Pickup Coil Cables (Chiranjib/Yi')
  3. VI update (Jin/Yi)
  4. NMR Lock-in repair (Yi)

EPR System

  1. EPR D2 assembly (Chiranjib/Yi)
  2. EPR RF Cable (Chiranjib/Yi')

Spin Flip

  1. Test plan (Yi/Jin)
  2. EPICS communication (Jin)
  3. Stepper Motor Commisioning (Jin)
  4. NMR Signal Acquisition (Yi/Jin/Chiranjib)
  5. 2nd Copy of Spin Signal (Jin)
  6. VI update (Yi/Jin)
  7. Finish up Documentation (Yi/Jin)
  8. Target Worker Quick Training Material (Yi/Jin)

EPICS & DAQ

  1. Target IOC (Jack/Bryan/Yi/Jin)
  2. Targe EPICS Variable to Data Stream (Yi/Jin)
  3. Analyzer code for target state (Jin)

Holding Field

  1. Optimal Field determination (Yi')
  2. Correction Field Calculation (Yi')
  3. Correction Coil connection (Chiranjib/Yi')

Cell Installation

  1. Reference Cell (Joe/Todd)
  2. He3 Cell (Joe)