Difference between revisions of "Meeting solid coll 2017 layout and magnet"
From Hall A Wiki
(→information) |
(→information) |
||
Line 13: | Line 13: | ||
* [http://hallaweb.jlab.org/12GeV/SoLID/meeting_coll/2017_02_layout_magnet/solid_layout_magnet_zwzhao_201702.pptx pptx] [http://hallaweb.jlab.org/12GeV/SoLID/meeting_coll/2017_02_layout_magnet/solid_layout_magnet_zwzhao_201702.pptx pdf] Zhiwen's note | * [http://hallaweb.jlab.org/12GeV/SoLID/meeting_coll/2017_02_layout_magnet/solid_layout_magnet_zwzhao_201702.pptx pptx] [http://hallaweb.jlab.org/12GeV/SoLID/meeting_coll/2017_02_layout_magnet/solid_layout_magnet_zwzhao_201702.pptx pdf] Zhiwen's note | ||
* magnet note from Jay | * magnet note from Jay | ||
− | ** The minimum acceptance/maxium steel model | + | ** The minimum acceptance/maxium steel model "Solid_model_forces.pdf", the larger acceptance model of "SolidXL.pdf" and "SolidXL_2variations.pdf" and the variation building in an upstream neutron detector (upstream plug with steel and scintillator layers) all viable magnetically, as would be something intermediate. Mechanical and detector concerns will determine final configuration. |
− | ** | + | ** notes are here https://solid.jlab.org/cgi-bin/private/ShowDocument?docid=2 (need to login with jlab account) |
− | + |
Revision as of 18:50, 16 February 2017
meeting info
- Date and Location: Monday 2/20, 9:30AM ET in CEBAF center F226
- Desktop sharing and video https://bluejeans.com/8540081197
- REMEMBER to turn off mic and speaker to avoid echo if you use phoneline for audio)
- Audio Dial: 18882402560 or 14087407256 (US or Canada only) (see all numbers) and enter the Conference ID
- meeting system "bluejeans" howto https://hallaweb.jlab.org/wiki/index.php/Bluejeans_howto
information
- SoLID Dimension and Layout
- SoLID Engineering Integration and CAD
- pptx pdf Zhiwen's note
- magnet note from Jay
- The minimum acceptance/maxium steel model "Solid_model_forces.pdf", the larger acceptance model of "SolidXL.pdf" and "SolidXL_2variations.pdf" and the variation building in an upstream neutron detector (upstream plug with steel and scintillator layers) all viable magnetically, as would be something intermediate. Mechanical and detector concerns will determine final configuration.
- notes are here https://solid.jlab.org/cgi-bin/private/ShowDocument?docid=2 (need to login with jlab account)