Difference between revisions of "Thursday, May 11, 2017 11:00am ET"
From Hall A Wiki
(→Minutes) |
|||
(5 intermediate revisions by one other user not shown) | |||
Line 5: | Line 5: | ||
<br><br> | <br><br> | ||
− | + | * Prototype coil | |
− | * | + | * Future work (recommendations from review - not ready) |
+ | * JLAB contract | ||
* Next meeting time | * Next meeting time | ||
− | |||
<br><br> | <br><br> | ||
Line 15: | Line 15: | ||
− | Attending: | + | Attending: Juliette, Seamus, KK, Jim, Jason, Ernie |
+ | |||
+ | * Prototype coil | ||
+ | ** in contact with Emerson | ||
+ | ** almost done | ||
+ | ** waiting for final quote | ||
+ | ** Ernie looked over the location to check electrical power/water cooling | ||
+ | * Future work (recommendations from review - not ready) | ||
+ | ** collimator/shielding - Cameron | ||
+ | *** ds petal is "only" a cleanup collimator | ||
+ | *** ds petal generates backgrounds - doesn't have to be right against the nose | ||
+ | *** going to move it as far upstream as possible - radiation on hybrid nose will go down by reduced solid angle | ||
+ | *** Cameron is working on the simulations | ||
+ | * JLAB contract (end of May) - finish the cigar collimator design | ||
+ | ** we're in extension now - need a new contract | ||
+ | *** describe deliverables from old, define activities for new | ||
+ | ** quality control/testing for prototype | ||
+ | ** upstream cigar collimator | ||
+ | *** water-cooling/thermal was part of old contract | ||
+ | *** manufacturing/motion/supports in new | ||
+ | ** Prototype | ||
+ | *** old contract deliverable was getting bids | ||
+ | *** new contract is time from MIT for construction/quality control, testing | ||
+ | ** Downstream toroid | ||
+ | *** test prototype coil before going forward | ||
+ | *** failure mode analysis? | ||
+ | ** Other work to be able to meet the "administrative-type" recommendations | ||
+ | *** try to define requirements for failure-mode analysis, etc. with JLAB design authority | ||
+ | * Next meeting time | ||
+ | ** plan to meet regularly (every two weeks) throughout the summer | ||
+ | ** Wednesdays at 2pm ET - next meeting on May 24th | ||
+ | ** inner photon collimator | ||
+ | ** downstream petal collimator | ||
+ | ** summarize contract | ||
+ | ** spectrometer simulations | ||
+ | * KK documenting recommendations for Bob to follow | ||
+ | ** physics - not engineering | ||
+ | ** Juliette and KK afternoon of Friday the 19th | ||
Latest revision as of 11:11, 23 May 2017
Last meeting: Monday, March 20, 2017 3:00pm EST
Agenda
- Prototype coil
- Future work (recommendations from review - not ready)
- JLAB contract
- Next meeting time
Minutes
Attending: Juliette, Seamus, KK, Jim, Jason, Ernie
- Prototype coil
- in contact with Emerson
- almost done
- waiting for final quote
- Ernie looked over the location to check electrical power/water cooling
- Future work (recommendations from review - not ready)
- collimator/shielding - Cameron
- ds petal is "only" a cleanup collimator
- ds petal generates backgrounds - doesn't have to be right against the nose
- going to move it as far upstream as possible - radiation on hybrid nose will go down by reduced solid angle
- Cameron is working on the simulations
- collimator/shielding - Cameron
- JLAB contract (end of May) - finish the cigar collimator design
- we're in extension now - need a new contract
- describe deliverables from old, define activities for new
- quality control/testing for prototype
- upstream cigar collimator
- water-cooling/thermal was part of old contract
- manufacturing/motion/supports in new
- Prototype
- old contract deliverable was getting bids
- new contract is time from MIT for construction/quality control, testing
- Downstream toroid
- test prototype coil before going forward
- failure mode analysis?
- Other work to be able to meet the "administrative-type" recommendations
- try to define requirements for failure-mode analysis, etc. with JLAB design authority
- we're in extension now - need a new contract
- Next meeting time
- plan to meet regularly (every two weeks) throughout the summer
- Wednesdays at 2pm ET - next meeting on May 24th
- inner photon collimator
- downstream petal collimator
- summarize contract
- spectrometer simulations
- KK documenting recommendations for Bob to follow
- physics - not engineering
- Juliette and KK afternoon of Friday the 19th