=== Status and plans for the week (Kondo) === | === Status and plans for the week (Kondo) === | ||
− | * Meeting with Whit today to | + | * Meeting with Whit today to discuss setup of UVa GEMs in EEL clean room 124 |
− | => Expect all the specifications and list of items to purchase from Whit by the end of the day | + | => gas system safety requirements: Studies already done by Dave Meekins and Whit => Expect all the specifications and list of items to purchase from Whit by the end of the day. |
+ | => Cosmic stand uni-strut frame: We discuss a few detail and agree in principle with the design => Whit will take a further look at the number for the mechanical properties to validate the design | ||
− | * | + | * Got an e-mail from Bryan Moffit on the modifications and upgrade of the MPD modules in order to be able to read APV25 configuration(registers) from i2c |
− | === | + | => The hardware+firmware solution involves connecting wires between a leg of an i2c repeater and a hole on the PCB that are reserved for FPGA I/O (pretty easy solution). |
+ | => The control over these I/O pins is given in the new firmware. This solution only provides you with the capability to read back the APV registers. | ||
+ | => will send a our MPDs 9not in use to him to implement these modifications (hardware + firmware) and then when Paolo arrives, he will test them with the libraries | ||
+ | |||
+ | * Will resume the cosmic data taking of the INFN chambers | ||
+ | |||
+ | => Change gas bottle yesterday and start flowing gas at low rate | ||
+ | => the chamber are at a low voltage 1kV. will start data this afternoon. | ||
+ | => Plan is to take some HV scan | ||
+ | |||
+ | === Status of the decoder / tracking software development (Siyu) === | ||
+ | |||
+ | *[[Media:20181004SBS GEM WEEKLY.pdf|20181004SBS GEM WEEKLY.pdf]] (Siyu) | ||
− | |||
=== AOB === | === AOB === | ||
* | * | ||
* | * |
Latest revision as of 11:48, 4 October 2018
GMn GEM commissioning Meetings: Thursday 9:00am - 10:00pm
Link to all previous meetings: GMn GEM Commissioning Meeting
Bogdan, Evaristo, Kondo, Michael, Nilanga, Siyu, Tongtong...
Status and plans for the week (Kondo)
- Meeting with Whit today to discuss setup of UVa GEMs in EEL clean room 124
=> gas system safety requirements: Studies already done by Dave Meekins and Whit => Expect all the specifications and list of items to purchase from Whit by the end of the day. => Cosmic stand uni-strut frame: We discuss a few detail and agree in principle with the design => Whit will take a further look at the number for the mechanical properties to validate the design
- Got an e-mail from Bryan Moffit on the modifications and upgrade of the MPD modules in order to be able to read APV25 configuration(registers) from i2c
=> The hardware+firmware solution involves connecting wires between a leg of an i2c repeater and a hole on the PCB that are reserved for FPGA I/O (pretty easy solution). => The control over these I/O pins is given in the new firmware. This solution only provides you with the capability to read back the APV registers. => will send a our MPDs 9not in use to him to implement these modifications (hardware + firmware) and then when Paolo arrives, he will test them with the libraries
- Will resume the cosmic data taking of the INFN chambers
=> Change gas bottle yesterday and start flowing gas at low rate => the chamber are at a low voltage 1kV. will start data this afternoon. => Plan is to take some HV scan
Status of the decoder / tracking software development (Siyu)
- 20181004SBS GEM WEEKLY.pdf (Siyu)