=== Status and plans for the week (Kondo) ===
 
=== Status and plans for the week (Kondo) ===
  
* Meeting with Whit today to get update on the gas system safety requirements for UVa GEMs in EEL clean room 124
+
* Meeting with Whit today to discuss setup of UVa GEMs in EEL clean room 124
  
   => Studies already done by Dave Meekins and Whit => Expect all the specifications and list of items to purchase from Whit by the end of the day.
+
   => gas system safety requirements: Studies already done by Dave Meekins and Whit => Expect all the specifications and list of items to purchase from Whit by the end of the day.
   => We discuss a few detail and agree in principle with the design => Whit will take a further look at the number for the mechanical properties to validate the design
+
   => Cosmic stand uni-strut frame: We discuss a few detail and agree in principle with the design => Whit will take a further look at the number for the mechanical properties to validate the design
  
 +
* Got an e-mail from Bryan Moffit on the modifications and upgrade of the MPD modules in order to be able to read APV25 configuration(registers) from i2c
  
=== Things to work on this week ===
+
  => The hardware+firmware solution involves connecting wires between a leg of an i2c repeater and a hole on the PCB that are reserved for FPGA I/O (pretty easy solution). 
 +
  => The control over these I/O pins is given in the new firmware.  This solution only provides you with the capability to read back the APV registers.
 +
  => will send a our MPDs 9not in use to him to implement these modifications (hardware + firmware) and then when Paolo arrives, he will test them with the libraries
 +
 
 +
* Will resume the cosmic data taking of the INFN chambers
 +
 
 +
  => Change gas bottle yesterday and start flowing gas at low rate
 +
  => the chamber are at a low voltage 1kV. will start data this afternoon.
 +
  => Plan is to take some HV scan 
 +
 
 +
=== Status of the decoder / tracking software development (Siyu) ===
 +
 
 +
*[[Media:20181004SBS GEM WEEKLY.pdf|20181004SBS GEM WEEKLY.pdf]] (Siyu)
  
*
 
 
=== AOB ===
 
=== AOB ===
 
*  
 
*  
 
*
 
*

Latest revision as of 11:48, 4 October 2018

GMn GEM commissioning Meetings: Thursday 9:00am - 10:00pm

Link to all previous meetings: GMn GEM Commissioning Meeting


Bogdan, Evaristo, Kondo, Michael, Nilanga, Siyu, Tongtong... 

Status and plans for the week (Kondo)

  • Meeting with Whit today to discuss setup of UVa GEMs in EEL clean room 124
  => gas system safety requirements: Studies already done by Dave Meekins and Whit => Expect all the specifications and list of items to purchase from Whit by the end of the day.
  => Cosmic stand uni-strut frame: We discuss a few detail and agree in principle with the design => Whit will take a further look at the number for the mechanical properties to validate the design
  • Got an e-mail from Bryan Moffit on the modifications and upgrade of the MPD modules in order to be able to read APV25 configuration(registers) from i2c
 => The hardware+firmware solution involves connecting wires between a leg of an i2c repeater and a hole on the PCB that are reserved for FPGA I/O (pretty easy solution).  
 => The control over these I/O pins is given in the new firmware.  This solution only provides you with the capability to read back the APV registers.
 => will send a our MPDs 9not in use to him to implement these modifications (hardware + firmware) and then when Paolo arrives, he will test them with the libraries
  • Will resume the cosmic data taking of the INFN chambers
 => Change gas bottle yesterday and start flowing gas at low rate
 => the chamber are at a low voltage 1kV. will start data this afternoon. 
 => Plan is to take some HV scan  

Status of the decoder / tracking software development (Siyu)

AOB