+ | == Todo list as Nov 10, 2008 == | ||
+ | |||
+ | === Before lock the laser === | ||
+ | # {{pass |EPR/NMR cross calibration (Chiranjib/Yi) 9:00 AM}} | ||
+ | |||
+ | === In the Hall/Controlled access === | ||
+ | # {{pass |Install new target ladder (Joe) 9:30AM}} | ||
+ | # {{pass |Check correction coils (Yi') 9:30AM}} | ||
+ | # Target EPICS readbacks:oven and cooling jets (Jack) | ||
+ | |||
+ | === Counting House during access === | ||
+ | # {{pass |Add real vertical coil current to EPICS (Jin)}} | ||
+ | # {{pass |Aborted, NMR pumping chamber frequency sweep/target chamber field sweep cross calibration (TBD)}} | ||
+ | # AFP loss test after Yi' finishes the correction coils (TBD) | ||
+ | |||
+ | === Other than access === | ||
+ | # {{pass |Comet laser power on/EPICS control test (Yi)}} | ||
+ | |||
+ | == Todo list for Controlled Access to the Hall, Nov 4, 2008 == | ||
+ | |||
+ | === Target Enclosure === | ||
+ | # {{pass|Transverse spectrum analyzer fiber}} | ||
+ | # {{pass|Hot air leak around the fiber}} | ||
+ | # {{pass|Transverse laser alignment ( Lock the Hall )}} | ||
+ | # {{pass|Replace damaged target ladder}} | ||
+ | |||
+ | === Optics Bench === | ||
+ | # {{pass|Transverse laser alignment ( Lock the Hall )}} | ||
+ | # {{pass|Clean optics}} | ||
+ | # {{pass|Swap damaged fibers for vertical line (N7, N9) to 04 and 05 from Longitudinal line}} | ||
+ | # {{pass|Check bad connector for vertical line (N6)}} | ||
+ | |||
+ | === Pivot Area === | ||
+ | # {{pass|Aborted:Extend EPR RF amplifier cable to check EPR ( Lock the Hall )}} | ||
+ | |||
+ | === Green Wall === | ||
+ | # {{pass|Connect Fluke45 current meters back to EPICS IOC}} | ||
+ | |||
+ | == Todo checklist for next lock of Hall, Oct 30, 2008 == | ||
+ | # {{pass |Repaire Down-stream pickup coil B}} | ||
+ | # {{pass |Laser alignment}} | ||
+ | # {{pass |Laser polarization}} | ||
+ | # {{pass |Q-wave plate polarization}} | ||
+ | # {{pass |Laser power}} | ||
+ | # {{pass |EPR D2 diode}} | ||
+ | # {{pass |Vertical spectrum analyzer fiber}} | ||
+ | |||
+ | == 10/26 rebuild == | ||
+ | |||
+ | Yi++=Yi Qiang + ALL | ||
+ | |||
+ | # {{pass|Ladder (Ed)}} | ||
+ | # {{pass| Limit Switch EPICS programming (Pam)}} | ||
+ | # {{pass|Heater Line (Ed/Joe/Scot)}} | ||
+ | # {{pass|Enclosure (Ed)}} | ||
+ | # {{pass|Ref Cell (Joe/Scot)}} | ||
+ | # {{pass|Water Calib (Yi++) aborted...}} | ||
+ | # {{pass|Adjust pickup coils on pumping chamber (Jin/Yi/Chiranjib)}} | ||
+ | # {{pass|Test Heater / Oven (Joe/Yi)}} | ||
+ | # {{pass|Mounting He3 Cell (Yi++)}} | ||
+ | # {{pass|Heating Cell (Yi++)}} | ||
+ | # {{pass|Laser Alignment Full Power (Yi, Chiranjib, JP)}} | ||
+ | # {{pass |APF Lost Test}} | ||
+ | # {{pass |Spin-down Test}} | ||
+ | # {{pass |Spin Up (Yi++)}} | ||
+ | # {{pass |Spin Flip Test (Jin)}} | ||
+ | # {{pass |EPR Alignment (Yi++)}} | ||
+ | # {{pass |Cross Calib Temp. Test (Yi++)}} | ||
+ | # Comet Laser (Yi++) | ||
+ | # EPICS Control (EPICS Grp) | ||
+ | # {{pass |TO Training Preparation (Yi/Chiranjib/Jin)}} | ||
+ | |||
== Laser System == | == Laser System == | ||
− | # Assemble COMET Lasers (Chiranjib/Yi) | + | # {{Pass|Assemble COMET Lasers (Chiranjib/Yi)}} |
# {{Pass|Move in a Rack to new target lab for COMET Lasers}} | # {{Pass|Move in a Rack to new target lab for COMET Lasers}} | ||
− | # Interlock connections to Lasers (Mark/Yi) | + | # {{pass|Interlock connections to Lasers (Mark/Yi)}} |
− | # Interlock connections in the Hall (Mark/Yi) | + | # {{pass|Interlock connections in the Hall (Mark/Yi)}} |
# {{pass|RTDs for Laser enclosure (Done by Yi'/Yi)}} | # {{pass|RTDs for Laser enclosure (Done by Yi'/Yi)}} | ||
# {{pass|RTDs to readout chassis for interlock (Yi')}} | # {{pass|RTDs to readout chassis for interlock (Yi')}} | ||
# {{pass|optics setup (Done by Chiranjib/Jin)}} | # {{pass|optics setup (Done by Chiranjib/Jin)}} | ||
# {{pass|Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)}} | # {{pass|Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)}} | ||
− | # Camera (Jin) | + | # {{pass|Camera (Jin) aborted }} |
− | # Spectrum analyzer (Yi) | + | # {{pass|Spectrum analyzer (Yi)}} |
# {{pass|Q-wave plate stepping motor (Jin)}} | # {{pass|Q-wave plate stepping motor (Jin)}} | ||
== Oven and Heater == | == Oven and Heater == | ||
− | # Heater Installation (Joe) | + | # {{pass|Heater Installation (Joe)}} |
− | # Heater Control Box and connection (Joe) | + | # {{pass|Heater Control Box and connection (Joe)}} |
# {{pass|Oven temperature control RTD (Yi')}} | # {{pass|Oven temperature control RTD (Yi')}} | ||
# {{pass|RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)}} | # {{pass|RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)}} | ||
Line 21: | Line 93: | ||
# {{pass|Longitudinal RF Coil Connection (Yi')}} | # {{pass|Longitudinal RF Coil Connection (Yi')}} | ||
# {{pass|Pickup Coil Cables (Chiranjib/Yi')}} | # {{pass|Pickup Coil Cables (Chiranjib/Yi')}} | ||
− | # VI update (Jin/Yi) | + | # {{pass |VI update (Jin/Yi)}} |
− | # NMR Lock-in repair (Yi) | + | # {{pass |NMR Lock-in repair (Yi)}} |
== EPR System == | == EPR System == | ||
− | # EPR D2 assembly (Chiranjib/Yi) | + | # {{pass|EPR D2 assembly (Chiranjib/Yi)}} |
− | # EPR RF Cable (Chiranjib/Yi') | + | # {{pass|EPR RF Cable (Chiranjib/Yi')}} |
== Spin Flip == | == Spin Flip == | ||
− | # Test plan (Yi/Jin) | + | # {{Pass|Test plan (Yi/Jin)}} |
− | # EPICS communication (Jin) | + | # {{Pass|EPICS communication (Jin)}} |
# {{Pass|Stepper Motor Commisioning (Jin)}} | # {{Pass|Stepper Motor Commisioning (Jin)}} | ||
− | # NMR Signal Acquisition (Yi) | + | # {{pass|NMR Signal Acquisition (Yi/Jin/Chiranjib)}} |
# {{Pass|2nd Copy of Spin Signal (Jin)}} | # {{Pass|2nd Copy of Spin Signal (Jin)}} | ||
− | # VI update (Yi/Jin) | + | # {{Pass|VI update (Yi/Jin)}} |
− | # Finish up Documentation (Yi/Jin) | + | # {{Pass|Finish up Documentation (Yi/Jin)}} |
− | # Target Worker Quick Training Material (Yi/Jin) | + | # {{Pass|Target Worker Quick Training Material (Yi/Jin)}} |
== EPICS & DAQ == | == EPICS & DAQ == | ||
− | # | + | # {{pass|Target IOC (Jack/Bryan/Yi/Jin)}} |
− | # Targe EPICS Variable to Data Stream (Yi/Jin) | + | # {{Pass|Targe EPICS Variable to Data Stream (Yi/Jin)}} |
# {{Pass|Analyzer code for target state (Jin)}} | # {{Pass|Analyzer code for target state (Jin)}} | ||
== Holding Field == | == Holding Field == | ||
− | # Optimal Field determination (Yi') | + | # {{pass|Optimal Field determination (Yi')}} |
− | # Correction Field Calculation (Yi') | + | # {{pass|Correction Field Calculation (Yi')}} |
− | # Correction Coil connection (Chiranjib/Yi') | + | # {{pass|Correction Coil connection (Chiranjib/Yi')}} |
== Cell Installation == | == Cell Installation == | ||
− | # Reference Cell (Joe/Todd) | + | # {{pass|Reference Cell (Joe/Todd)}} |
− | # He3 Cell (Joe) | + | # {{pass|He3 Cell (Joe)}} |
Latest revision as of 19:39, 11 November 2008
Contents
Todo list as Nov 10, 2008
Before lock the laser
- EPR/NMR cross calibration (Chiranjib/Yi) 9:00 AM
In the Hall/Controlled access
- Install new target ladder (Joe) 9:30AM
- Check correction coils (Yi') 9:30AM
- Target EPICS readbacks:oven and cooling jets (Jack)
Counting House during access
- Add real vertical coil current to EPICS (Jin)
- Aborted, NMR pumping chamber frequency sweep/target chamber field sweep cross calibration (TBD)
- AFP loss test after Yi' finishes the correction coils (TBD)
Other than access
- Comet laser power on/EPICS control test (Yi)
Todo list for Controlled Access to the Hall, Nov 4, 2008
Target Enclosure
- Transverse spectrum analyzer fiber
- Hot air leak around the fiber
- Transverse laser alignment ( Lock the Hall )
- Replace damaged target ladder
Optics Bench
- Transverse laser alignment ( Lock the Hall )
- Clean optics
- Swap damaged fibers for vertical line (N7, N9) to 04 and 05 from Longitudinal line
- Check bad connector for vertical line (N6)
Pivot Area
- Aborted:Extend EPR RF amplifier cable to check EPR ( Lock the Hall )
Green Wall
- Connect Fluke45 current meters back to EPICS IOC
Todo checklist for next lock of Hall, Oct 30, 2008
- Repaire Down-stream pickup coil B
- Laser alignment
- Laser polarization
- Q-wave plate polarization
- Laser power
- EPR D2 diode
- Vertical spectrum analyzer fiber
10/26 rebuild
Yi++=Yi Qiang + ALL
- Ladder (Ed)
- Limit Switch EPICS programming (Pam)
- Heater Line (Ed/Joe/Scot)
- Enclosure (Ed)
- Ref Cell (Joe/Scot)
- Water Calib (Yi++) aborted...
- Adjust pickup coils on pumping chamber (Jin/Yi/Chiranjib)
- Test Heater / Oven (Joe/Yi)
- Mounting He3 Cell (Yi++)
- Heating Cell (Yi++)
- Laser Alignment Full Power (Yi, Chiranjib, JP)
- APF Lost Test
- Spin-down Test
- Spin Up (Yi++)
- Spin Flip Test (Jin)
- EPR Alignment (Yi++)
- Cross Calib Temp. Test (Yi++)
- Comet Laser (Yi++)
- EPICS Control (EPICS Grp)
- TO Training Preparation (Yi/Chiranjib/Jin)
Laser System
- Assemble COMET Lasers (Chiranjib/Yi)
- Move in a Rack to new target lab for COMET Lasers
- Interlock connections to Lasers (Mark/Yi)
- Interlock connections in the Hall (Mark/Yi)
- RTDs for Laser enclosure (Done by Yi'/Yi)
- RTDs to readout chassis for interlock (Yi')
- optics setup (Done by Chiranjib/Jin)
- Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
- Camera (Jin) aborted
- Spectrum analyzer (Yi)
- Q-wave plate stepping motor (Jin)
Oven and Heater
- Heater Installation (Joe)
- Heater Control Box and connection (Joe)
- Oven temperature control RTD (Yi')
- RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)
NMR System
- Longitudinal RF Coil Connection (Yi')
- Pickup Coil Cables (Chiranjib/Yi')
- VI update (Jin/Yi)
- NMR Lock-in repair (Yi)
EPR System
- EPR D2 assembly (Chiranjib/Yi)
- EPR RF Cable (Chiranjib/Yi')
Spin Flip
- Test plan (Yi/Jin)
- EPICS communication (Jin)
- Stepper Motor Commisioning (Jin)
- NMR Signal Acquisition (Yi/Jin/Chiranjib)
- 2nd Copy of Spin Signal (Jin)
- VI update (Yi/Jin)
- Finish up Documentation (Yi/Jin)
- Target Worker Quick Training Material (Yi/Jin)
EPICS & DAQ
- Target IOC (Jack/Bryan/Yi/Jin)
- Targe EPICS Variable to Data Stream (Yi/Jin)
- Analyzer code for target state (Jin)
Holding Field
- Optimal Field determination (Yi')
- Correction Field Calculation (Yi')
- Correction Coil connection (Chiranjib/Yi')
Cell Installation
- Reference Cell (Joe/Todd)
- He3 Cell (Joe)