− | + | ==January 24th 2020== | |
+ | *Updates | ||
+ | *Gmn DAQ tasks : need to be ready January 2021 | ||
+ | **GEM readout : SSP ( VTP ?) | ||
+ | ** Switch CODA3 HRS, Bigbite, GRINCH, HCAL | ||
+ | ** TS for bigbite | ||
+ | *GEp DAQ tasks | ||
+ | **geometrical correlation ECAL HCAL | ||
+ | **HCAL trigger two crates | ||
+ | **Fast clear GEM | ||
+ | *Bigbite no Fastbus | ||
+ | ** No Edet, only shower on Fastbus : 243 channels = 16 FADC | ||
+ | ** VXS and VTP available from SoLID | ||
+ | ** if no FADC in HRS : 3 FADC HRS - 2 FADC compton , need find 11 FADC ( SoLID needs | ||
== December 13th 2019 == | == December 13th 2019 == |
Revision as of 11:23, 24 January 2020
Back to SuperBigBite
Bluejeans
https://bluejeans.com/596873830/?src=calendarLink
Contents
January 24th 2020
- Updates
- Gmn DAQ tasks : need to be ready January 2021
- GEM readout : SSP ( VTP ?)
- Switch CODA3 HRS, Bigbite, GRINCH, HCAL
- TS for bigbite
- GEp DAQ tasks
- geometrical correlation ECAL HCAL
- HCAL trigger two crates
- Fast clear GEM
- Bigbite no Fastbus
- No Edet, only shower on Fastbus : 243 channels = 16 FADC
- VXS and VTP available from SoLID
- if no FADC in HRS : 3 FADC HRS - 2 FADC compton , need find 11 FADC ( SoLID needs
December 13th 2019
- GEp DAQ layout
https://hallaweb.jlab.org/wiki/images/c/c1/SBS_GEp_DAQ_Timing.pdf
- GMn / Bigbite DAQ layout
https://hallaweb.jlab.org/wiki/images/6/61/BBGlobalScheme_prel.pdf
https://userweb.jlab.org/~efuchey/SBS_BB/Pictures/BBweldment_fulllayout-Real_weldment_1-4.pdf
https://userweb.jlab.org/~efuchey/SBS_BB/Pictures/BBweldment_fulllayout-Real_weldment_5-8.pdf
- Updates
- INFN GEM
Isue with MPD 7 , when masked issue goes to another MPD
- HCAL : all channels cabled, 1st half all issues fixed. Setting up for cosmics, test turn on all FADC and TDCs did not crash !
- UVA GEM : old SSP firmware running with one SSP, ready testing new SSP firmware ( 16 MPDs ) , use cosmics
November 22th 2019
- HCAL status
- debugging old half, 6 channels have issues - TDC or discriminator issues maybe for 4 of them - 2 might be related to VME slot ? -
look with Bryan's decoder located in /site/coda/contrib/devel/dataDecode - if really looks like hardware issue can use VME bus analyzer
- Ben setup the FADC gui - will be useful for FADC/detector debugging - Scott will write some documentation on wiki
- start cabling other half of detector maybe next week
- control pulser - use L1A to trigger LED, or use a VME pulser ( will try to give a DVCS LED board to Juan Carlos )
- Grinch
- DAQ issues - crashing for long runs
- need to investigate - maybe check event size
- BigBite
- need new TS crate to check the final timing
- takes about to generate Shower trigger : 60 ns cable + 60 ns logic + cable 25 m = 100 ns ~ 250 ns
October 25th 2019
- Detectors DAQ status
- BigBite
- ADCs working fine running with CODA 2
- signals from all shower preshower channels
- can look at data with scripts
- add TDCs to setup (27x7 + 2x27 ) = 243 channels, only sums so 52 channels ( 1 x 1877S )
- try CODA3
- BigBite
- HCal
- FADC and F1 all running on HCAL
- resolution checks, not good right now, might be due to discriminator ( Phillips 715 )
- looking at cosmics
- all cables for second half of HCAL
- still unlock error on 1 TDC , need try lower resolution
- still on CODA2
- HCal
- CODA3 testing (Bob) pdf
- decoder in Podd can figure out if CODA3 or CODA2 data so should be transparent to SBS online library
- trigger data not decoded yet
- Eric tried CODA3 at beginning but still need some work for Fastbus
- Need CODA3 for VTP
- ATOM CPU testing
- does not work out from the box
October 4th 2019
- Bigbite DAQ status ( Eric )
- slide here pdf
- taking data but timing needs to be done to look at detector signals
- Eric should look at existing PODD classes for shower to decode Fastbus
- Shower trigger : less than 200 ns
- test trigger lines : 190 ns might
- HCAL DAQ status ( Scott )
- 2 crates : 1 VXS crates with FADC and 1 VME64X with F1 and FADC
- - see cosmics in both crates in FADC , missing in TDC ( need to check new timing with 2 crates )
- - resolution lock issue with F1, might be overheating
- - add blanks to improve cooling
- - reduce resolution of F1 to see if problem goes away
- - latency from TI ( OT2 is prompt output less delay down to 200 ns)
- UVA GEM status (Bryan / Kondo )
- - 3 VME crates in clean room with TI ( 2 VME and 1 VXS ) : 2 planes per crate , 1 TI and one fiber, need 1 TI with two transceiver
- - using CODA3
- - wiki with information on wiki : SBS_DAQ:_GEM_EEL_Cleanroom_setup
- - computer ready soon
- - 3rd (VXS) crate with SSP and MPDs
- SSP readout ( Ben )
- - 16 MPD for 1 SSP to be tested
- - all transceiver and fibers on site
- - test radiation hardness of transceivers and fibers
- BCM digital :
- - daughter board design done, need to make prototypes and test
- Certification of electronics : need to check with Ed Folts ( Nilanga question )
- CDet
- All TDC for coordinate in weldment : need checks ?
- Software : running DAQ CODA and root scripts to analyze, need to check if other functionalities needed. Library can be loaded in Hall A / SBS analyzer
- amount of TDCs for CDet sufficient