== Agenda ==
 
== Agenda ==
 
* Discussion on SoLID cost estimation according to WBS (Work Breakdown
 
* Discussion on SoLID cost estimation according to WBS (Work Breakdown
Line 6: Line 8:
 
== Minutes ==
 
== Minutes ==
  
**JP
+
*Stephen: Now the slow control cost estimation from DAQ has been added.
 +
*JP: We have some document format and formular issue,
 +
*Zhiwen: will modify the budget estimation document format, and send it through email.
 +
*JP: Do you have any questions on this?
 +
*Nilanga: For the time line problem, what's the start time?
 +
*JP:  FY22 (10/01/2021)is the starting point based on the current information. For the construction, some detectors can start early, i.e. PMTs can be ordered early.
 +
*Alexandre: What's the electronics start time?
 +
*JP: If you already have the main ideas before the engineering design, you can start early.
 +
*Paul: For the  invited talk related to HallA/HallC,  is it good to talk about the SoLID?
 +
*JP: Good point, we event should try the contributed talk too.
 +
*JP: China workshop, is anyone interested to go?
  
 
==Present==
 
==Present==
 
Alexandre, JP, Michael, Paul, Nilanga, Seamus, Stephen,  Whit, Ye, Rich, and Zhiwen
 
Alexandre, JP, Michael, Paul, Nilanga, Seamus, Stephen,  Whit, Ye, Rich, and Zhiwen

Latest revision as of 15:39, 7 December 2020

This page has been moved to https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_June_3,_2019_9:30am_EDT in the new SoLID Wiki. Please do not edit this page.

Agenda

  • Discussion on SoLID cost estimation according to WBS (Work Breakdown

Structure)

  • Sub-system updates

Minutes

  • Stephen: Now the slow control cost estimation from DAQ has been added.
  • JP: We have some document format and formular issue,
  • Zhiwen: will modify the budget estimation document format, and send it through email.
  • JP: Do you have any questions on this?
  • Nilanga: For the time line problem, what's the start time?
  • JP: FY22 (10/01/2021)is the starting point based on the current information. For the construction, some detectors can start early, i.e. PMTs can be ordered early.
  • Alexandre: What's the electronics start time?
  • JP: If you already have the main ideas before the engineering design, you can start early.
  • Paul: For the invited talk related to HallA/HallC, is it good to talk about the SoLID?
  • JP: Good point, we event should try the contributed talk too.
  • JP: China workshop, is anyone interested to go?

Present

Alexandre, JP, Michael, Paul, Nilanga, Seamus, Stephen, Whit, Ye, Rich, and Zhiwen