(Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel))
Line 14: Line 14:
 
=== Update on UVa GEM commissioning (Kondo & Anu) ===
 
=== Update on UVa GEM commissioning (Kondo & Anu) ===
  
*
+
* From Brad's email:
 +
** Walt Akers has confirmed that the largest GEM frame can be moved to the EEL/124 cleanroom as soon as it's ready.  (The two smaller frames stay in the ESB as planned).
 +
** The base alignment spacers (large frame) we were given from Hall A are not the correct height.  Check with Chris the designer if can correct this (Status?).
 +
 
 +
* [https://hallaweb.jlab.org/wiki/index.php/File:UVA_GEM_layer_mounting_brackets_into_GEn-RP_Frame.pdf https://hallaweb.jlab.org/wiki/index.php/File:UVA_GEM_layer_mounting_brackets_into_GEn-RP_Frame.pdf]
  
 
=== TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean) ===
 
=== TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean) ===

Revision as of 10:49, 3 March 2021

GMn GEM commissioning Meetings: WEDNESDAY 10:00am - 11:00am

Link to all previous meetings: GMn GEM Commissioning Meeting


GEM setup for GEN-RP plans (Brad)

Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel)

Update on UVa GEM commissioning (Kondo & Anu)

  • From Brad's email:
    • Walt Akers has confirmed that the largest GEM frame can be moved to the EEL/124 cleanroom as soon as it's ready. (The two smaller frames stay in the ESB as planned).
    • The base alignment spacers (large frame) we were given from Hall A are not the correct height. Check with Chris the designer if can correct this (Status?).

TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean)

Update from cosmic data (Malinga & Thir)

Update on the Tracking efficiency / resolution (Andrew)

Update on the High rate DAQ development (Ben, Alex, Paolo, Holly, Sean)