Difference between revisions of "Meeting 2021 03 03"
From Hall A Wiki
(→Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel)) |
(→Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel)) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 8: | Line 8: | ||
* | * | ||
− | === Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel) === | + | === Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel, Holly) === |
*[https://hallaweb.jlab.org/wiki/index.php/File:GEMmeeting03032021.pdf https://hallaweb.jlab.org/wiki/index.php/File:GEMmeeting03032021.pdf] | *[https://hallaweb.jlab.org/wiki/index.php/File:GEMmeeting03032021.pdf https://hallaweb.jlab.org/wiki/index.php/File:GEMmeeting03032021.pdf] | ||
Line 14: | Line 14: | ||
=== Update on UVa GEM commissioning (Kondo & Anu) === | === Update on UVa GEM commissioning (Kondo & Anu) === | ||
− | * | + | * From Brad's email: |
+ | ** Walt Akers has confirmed that the largest GEM frame can be moved to the EEL/124 cleanroom as soon as it's ready. (The two smaller frames stay in the ESB as planned). | ||
+ | ** The base alignment spacers (large frame) we were given from Hall A are not the correct height. Check with Chris the designer if can correct this (Status?). | ||
+ | |||
+ | * [https://hallaweb.jlab.org/wiki/index.php/File:UVA_GEM_layer_mounting_brackets_into_GEn-RP_Frame.pdf https://hallaweb.jlab.org/wiki/index.php/File:UVA_GEM_layer_mounting_brackets_into_GEn-RP_Frame.pdf] | ||
=== TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean) === | === TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean) === | ||
− | * | + | *[https://hallaweb.jlab.org/wiki/images/6/6f/BB_DAQ_3_3_21.pdf BB UVa GEM DAQ Update] |
=== Update from cosmic data (Malinga & Thir) === | === Update from cosmic data (Malinga & Thir) === |
Latest revision as of 11:04, 3 March 2021
GMn GEM commissioning Meetings: WEDNESDAY 10:00am - 11:00am
Link to all previous meetings: GMn GEM Commissioning Meeting
Contents
- 1 GEM setup for GEN-RP plans (Brad)
- 2 Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel, Holly)
- 3 Update on UVa GEM commissioning (Kondo & Anu)
- 4 TEDF BB UVa GEM data & MPD noise reduction (Xinzhan / Sean)
- 5 Update from cosmic data (Malinga & Thir)
- 6 Update on the Tracking efficiency / resolution (Andrew)
- 7 Update on the High rate DAQ development (Ben, Alex, Paolo, Holly, Sean)
GEM setup for GEN-RP plans (Brad)
Update on INFN GEM commissioning (Evaristo, Roberto, Ezekiel, Holly)
Update on UVa GEM commissioning (Kondo & Anu)
- From Brad's email:
- Walt Akers has confirmed that the largest GEM frame can be moved to the EEL/124 cleanroom as soon as it's ready. (The two smaller frames stay in the ESB as planned).
- The base alignment spacers (large frame) we were given from Hall A are not the correct height. Check with Chris the designer if can correct this (Status?).