Difference between revisions of "D2n Target Operator Check List"
From Hall A Wiki
(New page: Target Operator Should Go Through This check list for every shift. == Every Half Hour == * Pumping Laser Absorption Spectrum == Every 2 Hour == * Check Cell Temperature * Check Oven Temp...) |
|||
Line 3: | Line 3: | ||
== Every Half Hour == | == Every Half Hour == | ||
* Pumping Laser Absorption Spectrum | * Pumping Laser Absorption Spectrum | ||
− | |||
− | |||
* Check Cell Temperature | * Check Cell Temperature | ||
* Check Oven Temperature | * Check Oven Temperature | ||
− | == Every 4 | + | == Every 4 Hours during 3He production == |
* Do NMR Frequency sweep in between two production runs | * Do NMR Frequency sweep in between two production runs | ||
Line 18: | Line 16: | ||
== After Call for Beam to MCC == | == After Call for Beam to MCC == | ||
− | * Check Raster Size | + | * Check Raster Size (4x4, 4x5.2 MCC) |
− | * Check Beam Current | + | * Check Beam Current (4uA) |
* Check Trigger Rate | * Check Trigger Rate |
Revision as of 23:56, 9 February 2009
Target Operator Should Go Through This check list for every shift.
Contents
Every Half Hour
- Pumping Laser Absorption Spectrum
- Check Cell Temperature
- Check Oven Temperature
Every 4 Hours during 3He production
- Do NMR Frequency sweep in between two production runs
Every Shift
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Cell Temperature Reading (Optional/Automatic)
- Screen Shot Oven Temperature Reading (Optional/AUtomatic)
- Screen Shot of Holding Field Current (Optional/Automatic)
After Call for Beam to MCC
- Check Raster Size (4x4, 4x5.2 MCC)
- Check Beam Current (4uA)
- Check Trigger Rate