Difference between revisions of "Shift How-To"
From Hall A Wiki
(→Reporting and Logging) |
(→Beam Line) |
||
Line 35: | Line 35: | ||
== Beam Line == | == Beam Line == | ||
+ | * [[Monitoring the Beam Line]] | ||
* [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)] | * [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)] | ||
* [[SBS checkout procedure]] | * [[SBS checkout procedure]] |
Revision as of 13:35, 30 July 2021
Contents
Overview
This page gives instructions for various aspects of the experiment relating to each of the major subsystems and shift tasks.
Shift Roles
- Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
- Target Operator: Monitors the target system
- Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded
Reporting and Logging
All shift takers should regularly log shift details in HALOG - the Hall A electronic logbook.
Shift leaders should fill out Beam Time Accounting (BTA) information during the shift.
Taking Data
- Using the CODA DAQ
- GUI Description
- Starting a Run
- Stopping a Run
- Monitoring the data
- Online analysis
- Shift checklist
Recovery Procedures
Systems
Alarms
Beam Line
- Monitoring the Beam Line
- Hall A beam line drawing (to be updated)
- SBS checkout procedure
- SBS spot++ (beam size verification)
- SBS BPM calibration
- SBS HARP scan
- SBS Polarization Measurements
- Compton: Not Used
- SBS Moller
Target
Magnets
Detectors
BigBite
- GEMs
- GRINCH
- Timing Hodoscope
- Preshower and Shower
Super BigBite
- GEMs
- HCAL