Difference between revisions of "Shift How-To"

From Hall A Wiki
Jump to: navigation, search
(Reporting and Logging)
(Beam Line)
Line 35: Line 35:
 
== Beam Line ==
 
== Beam Line ==
  
 +
* [[Monitoring the Beam Line]]
 
* [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)]
 
* [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)]
 
* [[SBS checkout procedure]]  
 
* [[SBS checkout procedure]]  

Revision as of 13:35, 30 July 2021

Overview

This page gives instructions for various aspects of the experiment relating to each of the major subsystems and shift tasks.

Shift Roles

  • Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
  • Target Operator: Monitors the target system
  • Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded

Reporting and Logging

All shift takers should regularly log shift details in HALOG - the Hall A electronic logbook.

Shift leaders should fill out Beam Time Accounting (BTA) information during the shift.

Taking Data

  • Using the CODA DAQ
    • GUI Description
    • Starting a Run
    • Stopping a Run
  • Monitoring the data
  • Online analysis
  • Shift checklist

Recovery Procedures

Systems

Alarms

Beam Line

Target

Magnets

Detectors

BigBite

  • GEMs
  • GRINCH
  • Timing Hodoscope
  • Preshower and Shower

Super BigBite

  • GEMs
  • HCAL