Difference between revisions of "Shift How-To"

From Hall A Wiki
Jump to: navigation, search
(Beam Line)
(Systems)
Line 30: Line 30:
  
 
= Systems =
 
= Systems =
 +
 +
== High Voltage ==
 +
 +
* [[SBS EPICS]]
  
 
== Alarms ==
 
== Alarms ==

Revision as of 13:53, 9 August 2021

Overview

This page gives instructions for various aspects of the experiment relating to each of the major subsystems and shift tasks.

Shift Roles

  • Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
  • Target Operator: Monitors the target system
  • Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded

Reporting and Logging

All shift takers should regularly log shift details in HALOG - the Hall A electronic logbook.

Shift leaders should fill out Beam Time Accounting (BTA) information during the shift.

Taking Data

  • Using the CODA DAQ
    • GUI Description
    • Starting a Run
    • Stopping a Run
  • Monitoring the data
  • Online analysis
  • Shift checklist

Recovery Procedures

Systems

High Voltage

Alarms

Beam Line

Target

Magnets

Detectors

BigBite

  • GEMs
  • GRINCH
  • Timing Hodoscope
  • Preshower and Shower

Super BigBite

  • GEMs
  • HCAL