Difference between revisions of "August 13th 2021"
From Hall A Wiki
(Created page with "*Updates **HCal **Bigbite Shower **Bigbite Hodoscope **GRINCH **LHRS **CDet **GEM BB Hall A **GEM INFN Test Lab **RF time **HV **Scalers *On-going tasks **Network setup (...") |
|||
Line 10: | Line 10: | ||
**RF time | **RF time | ||
**HV | **HV | ||
+ | ***HV GUI for the GEM people. | ||
**Scalers | **Scalers | ||
− | + | ***Also I got the DSC modules to work as scalers and I am setting up a bunch of SIS scalers as 3800s. I also have 4 G0 scalers that we could use, but we should make sure that they have wide input signals (>10 ns) and that we don’t use them for anything critical like deadtime, efficiency, beam current etc. | |
Revision as of 10:30, 13 August 2021
- Updates
- HCal
- Bigbite Shower
- Bigbite Hodoscope
- GRINCH
- LHRS
- CDet
- GEM BB Hall A
- GEM INFN Test Lab
- RF time
- HV
- HV GUI for the GEM people.
- Scalers
- Also I got the DSC modules to work as scalers and I am setting up a bunch of SIS scalers as 3800s. I also have 4 G0 scalers that we could use, but we should make sure that they have wide input signals (>10 ns) and that we don’t use them for anything critical like deadtime, efficiency, beam current etc.
- On-going tasks
- Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%)
- Scaler crate setup (50 % - Steve ) - need fix supply
- documentation of VME crate names to power cycle
- 3 rd GEM VXS crate install router moved up ( 50% )
- need power and network in GEM bunker ( done )
- boot VME controllers (90 % done - need ask hostname TS crate )
- TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
- detector cabling
- new MPD production - about to start - FPGA shipped to Paolo
- MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
- MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )
- setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver
- need to install remote switch for crate in bunker - rest are VXS or VME64 -
- Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install
- TS setup - 50 %
- Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David )
- HCAL cabling
- HCAL need power ( done, Berta )
- Mark hodoscope trigger ?
- Computer move to Hall A : sbsdaq1/2 tedbbdaq (done ) enpcamsonne ( done )
- LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run
- Cosmics trigger ( Bogdan ? 0 %)
- Cosmics HCAL
- Cosmics Shower
- Cosmics Hodoscope
- Test 10 gig link to DAQ
- EPICS script
- alarm handler (David)
- Outstanding issues
- 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done )
- SD delay : still need 2 SDs ( Glasgow and INFN just requested quote )
- need to adjust for HCAL transit time with different PMTs
- status of cosmics paddles ( installed by Bogdan )
- GEM fibers too short : Mark will order parts
- 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot -
- APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
- GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
- GEM HV IP need setup ( Alex ) Done
- GEM clock/trigger box