Difference between revisions of "August 20th 2021"
From Hall A Wiki
(Created page with "*Updates **HCal ***HCal fully cabled ***starting reestablishing DAQ, can log to ROC ***will work today on HV (rpi20 and 21) *** and try to take data *** summing trigger should...") |
|||
Line 1: | Line 1: | ||
*Updates | *Updates | ||
**HCal | **HCal | ||
− | |||
− | |||
− | |||
− | |||
− | |||
**Bigbite Shower | **Bigbite Shower | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
**Bigbite Hodoscope | **Bigbite Hodoscope | ||
− | |||
− | |||
− | |||
− | |||
− | |||
**GRINCH | **GRINCH | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
**LHRS | **LHRS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
**CDet | **CDet | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
**GEM INFN Test Lab | **GEM INFN Test Lab | ||
− | |||
− | |||
− | |||
**RF time | **RF time | ||
− | |||
**HV | **HV | ||
− | |||
− | |||
− | |||
− | |||
**Scalers | **Scalers | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
**EPICS | **EPICS | ||
− | |||
− | |||
**Helicity | **Helicity | ||
− | + | **start / stop / EPICS scripts | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | **start / stop / EPICS | + | |
− | + | ||
Line 89: | Line 19: | ||
**Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) | **Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) | ||
**Scaler crate setup (70 % - Steve ) - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray - CAEN | **Scaler crate setup (70 % - Steve ) - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray - CAEN | ||
− | **documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan | + | **documentation of VME crate names to power cycle - [[https://hallaweb.jlab.org/wiki/index.php/SBS_Network_Devices_in_Hall_A ]]- need to make sure all VXS are in dhcp -Bryan |
**3 rd GEM VXS crate install router moved up ( 100% ) | **3 rd GEM VXS crate install router moved up ( 100% ) | ||
**need power and network in GEM bunker ( done ) | **need power and network in GEM bunker ( done ) |
Revision as of 10:32, 20 August 2021
- Updates
- HCal
- Bigbite Shower
- Bigbite Hodoscope
- GRINCH
- LHRS
- CDet
- GEM INFN Test Lab
- RF time
- HV
- Scalers
- EPICS
- Helicity
- start / stop / EPICS scripts
- On-going tasks
- Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%)
- Scaler crate setup (70 % - Steve ) - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray - CAEN
- documentation of VME crate names to power cycle - [[1]]- need to make sure all VXS are in dhcp -Bryan
- 3 rd GEM VXS crate install router moved up ( 100% )
- need power and network in GEM bunker ( done )
- boot VME controllers (100 % done - need ask hostname TS crate )
- TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
- detector cabling
- new MPD production - about to start - FPGA shipped to Paolo -
- MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
- MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )
- setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver
- need to install remote switch for crate in bunker - rest are VXS or VME64 -
- Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install
- TS setup - 50 %
- Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David )
- HCAL cabling
- HCAL need power ( done, Berta )
- Mark hodoscope trigger ?
- Computer move to Hall A : sbsdaq1/2/3 tedbbdaq (done ) enpcamsonne ( done ) - need to install X server - Need ask Ole -
- LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run
- Cosmics trigger ( Bogdan ? 0 %) -
- Cosmics HCAL
- Cosmics Shower
- Cosmics Hodoscope
- Test 10 gig link to DAQ to adaq1
- EPICS script -
- alarm handler (David)
- Outstanding issues
- 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done )
- SD delay : still need 2 SDs ( Glasgow and INFN just requested quote )
- need to adjust for HCAL transit time with different PMTs
- status of cosmics paddles ( installed by Bogdan )
- GEM fibers too short : Mark will order parts - need to check status of order
- 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot -
- APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
- GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
- GEM HV IP need setup ( Alex ) Done
- GEM clock/trigger box for BB side