(Created page with "*Updates **HCal ***HCal fully cabled ***starting reestablishing DAQ, can log to ROC ***will work today on HV (rpi20 and 21) *** and try to take data *** summing trigger should...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
*Updates
 
*Updates
 
**HCal
 
**HCal
***HCal fully cabled
+
***analog sum setup using for cosmics
***starting reestablishing DAQ, can log to ROC
+
***DAQ running, can see pulses in data
***will work today on HV (rpi20 and 21)
+
***still take a day or so to check out everything
*** and try to take data
+
***can take cosmics to have things set up as in Test Lab
*** summing trigger should be working, need to adjust for delays with different PMTs
+
***software setup
 
**Bigbite Shower
 
**Bigbite Shower
***Eric, Provokar
+
***finished all cabling signal and HV and trigger monitoring, cosmics paddle cabling and labeling
***need plug in 15 more bundles
+
***scalers : all supplies to make the special cables, need to make sure not to forget remove terminator on scaler
***need plug scalers ( NIM/ECL converter to scaler and F1 TDC)
+
***can see signal from the cosmics trigger - cosmics
*** set up cosmics
+
***mapping check on detector side
*** need cable for BigBite shower thresholds
+
***moving from front end to bunker for mapping check - only one mistake found so far
*** will finish cabling this week, start turning on next week
+
***continue checks and turn one layer at a time and look at individual signals
*** check mapping
+
***HV can be controlled with HV GUI
*** Bryan configuring all detectors today - think to finish today
+
***cosmics calibration
 +
***Mark set up cosmics trigger, if someone need to use it coordinate with Mark
 +
***cables on table - used to look at trigger rates
 +
***odd thing with scaler rates : sum much higher than individual sum of channels
 +
***Provokar will check offset of the analog fan - to see where the threshold can be set
 +
***Cable for threshold for DAQ - still need to be installed - 50 meters might be long enough for that
 
**Bigbite Hodoscope
 
**Bigbite Hodoscope
***all ADC and TDC cabled at detector frame and signal going to bunker, all cables reach in bunker - TDC cables a bit short to reach converter -
+
***HV just setup thanks to Steve
***connecting ADC, TDC, HV and LV left
+
***LV : were thinking combined voltage with GRINCH but did not work out to have both for GRINCH and hodoscope, so need another supply, Jack ordered another supply
***software progress by Rachel
+
***cabling : need extension on TDC cables - next week
***ADC cables 100 m
+
***can start looking at signals straight from PMTs
*** need to setup gate for ADC
+
***all cables laid out
 
**GRINCH
 
**GRINCH
***existing cabling was redone at Bogdan's request - slack near BB was moved  in near main bunker
+
***good progress
***half fully cable
+
***GRINCH fully cables
***other
+
***HV cables and on
***TDC will be redone
+
***checking all signals, 3 BNC head need to be fixed for ADC, most signals look good
***HV cables laid and are connected
+
***powered HV incrementally : most TDC channels are working
***rpi17 HV
+
***need to replace 2 NINO cards
***share same LV cable 
+
***some boards cannot reach 5V
***software ok, still need online monitoring
+
***hodoscope using older version
***still need to move to a-onl account
+
***can use spares - old version found by Rachel - she is shipping it
***scalers display ? Existing and will be installed
+
***checking mapping of detector
 +
***scalers display working in the bunker in bbhodo account
 +
***still need to try to run CODA
 
**LHRS
 
**LHRS
***Maria learning PID for LHRS software
+
***Maria working on the PID software
***Bob helping Ole in counting room ( should be ready in 2 weeks )
+
***looking at target reconstruction
***still connect to connect to TS - should receive the part fiber next week and can try
+
***Bob still working with Ole on counting house
***pulser to simulation coincidence
+
***EDTM ? Need to look for it
+
 
**CDet
 
**CDet
***taking data to optimize resistors
+
***last of optimized resistor in
***after look different HV for efficiency
+
***few individual pixels which have smaller than expected amplitude - might need to fix / adjust
***helping in Hall for installation
+
***once all fixed will take cosmics for threshold and efficiencies
***CNU starting again next week
+
**GEM BB Hall A
+
***23 MPDs in Hall
+
*** all up to date for firmware
+
*** can update firmware in test lab
+
*** 10:30 AM power outage, because UV layers, LV was plug on same socket and tripped. Nothing can be read out yet. Being investigated, Thir bringing spares
+
***need trigger fan/out box for rest of MPDs
+
 
+
**GEM INFN Test Lab
+
***HV test on two SBS layers, HV tripping is due to shielding - putting shielding in pieces to see where it can short -
+
***SSP crate to update firmware for MPDs
+
 
+
 
**RF time  
 
**RF time  
 
 
**HV
 
**HV
***MPOD HV GUI for the GEM people
+
***All HV crates are up, except for VME CAEN card in INFN GEM
***HV for shower and GRINCH up
+
***EPICS for HV working
*** will check hcal
+
***if want to try : go to aslow@adaqsc and type gohv
 
+
***GUI for HVs
 +
***will give infor about HRS to add to the EPICS GUI
 
**Scalers
 
**Scalers
***Also I got the DSC modules to work as scalers and I am setting up a bunch of SIS scalers as 3800s.  I also have 4 G0 scalers that we could use, but we should make sure that they have wide input signals (>10 ns) and that we don’t use them for anything critical like deadtime, efficiency, beam current etc.
+
***progress with scaler
***Bigbite scalers to be added to this crate
+
***scaler server setup - Mark is using to look at rates
**Recoil polarimeter
+
***4 G0 scalers are working - could use for detector rates - need to make sure width is greater than 20 ns - can be used for monitoring
***hodoscope plugged
+
***trigger monitor just for rates - will use to monitor trigger rate - check discriminator width
***DAQ rack for experiment set up
+
***starting using Hall A system to boot CPU
+
 
+
 
**EPICS
 
**EPICS
***David found alh not available ( used on old computer - hacweb7 ) will move to adaqsc -
+
***David on site
 
+
 
**Helicity
 
**Helicity
***scalers installed, Paul back from vacation
+
***Paul on site this week , helicity signal patched down to LHRS , and patched down from patch panel to behind the wall, can use to go to SBS crate
routine pick -up scaler event for the helicity seed and will be inserted in data stream
+
***disconnected the RHRS cables so we can to patch to go to SBS DAQ
***helicity signal in counting room - not reaching HRS -need to check cable and trace
+
***need 12 cables from DAQ bunker to behind green wall for signals
***same data stream in SBS scaler crate : need libraries on sbsvme29, library for 3801 - could be easier if in different crate - will check to put it in TS crate or hodo crate
+
***signals connected to helicity scalers : check with standalone program, everything is showing up, still need to integrate code into crl for LHRS
*** reported helicity and T settle signal tagged in trigger
+
***minor modifications need for the QWeak helicity class to get it to work with the current system - inside Podd framework - we are using the master version - 1.75 - Paul will add to master - will be used as a plug-in same as usual helicity decoder - might still need to recompile Podd after added
 
+
**start / stop / EPICS scripts
***taking the RHRS signal to SBS weldement
+
**GEM
 
+
***Bigbite GEM Hall A
**start / stop / EPICS script
+
***took pedestal data with SSP two days ago - UV UVA look as expected -
***Bob has templates working with CODA3
+
***lot of noise compared to TEDF - 20 to 100 ADC in Hall - not sure source - might be grounding and other to be improved
 
+
***trying to find if BigBite can be shielded to see if this improves noise
 
+
***shielding on J3 in Test Lab, but still HV issues to be figured out
 +
***all fibers working on SSP
 +
***all UVA chamber to VTP : can get VTP data this morning. Some fibers not showing up. Holly swapped around fibers - but still need to figure out issue
 +
***INFN : just working on shielding - no DAQ for now
 +
***received fiber extension - can lay out spares - need to check if we have protective sleeve - most likely 100 feet left - check with Scott
 +
***UVA  : just testing Bigbite setup
 +
***might move from cleanroom to TEDF
  
*On-going tasks
+
*On-going tasks  
**Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%)
+
**Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) - MPD bunker will move with SBS - ordering longer fiber to take that into account
**Scaler crate setup (70 % - Steve ) - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray - CAEN
+
**Scaler crate setup (90 % - Steve )- still need to add the CODA part - if add barebone read out - right now scalers at 3800 - helicity scaler set as 3801- could work if stay this way- Steve scan the crate - can make that the scaler is not initialized by Steve program - sbsvme29 - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray (done )- CAEN
**documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan
+
**documentation of VME crate names to power cycle - [[https://hallaweb.jlab.org/wiki/index.php/SBS_Network_Devices_in_Hall_A ]]- need to make sure all VXS are in dhcp -Bryan
 
**3 rd GEM VXS crate install router moved up ( 100%  )
 
**3 rd GEM VXS crate install router moved up ( 100%  )
 
**need power and network in GEM bunker ( done )  
 
**need power and network in GEM bunker ( done )  
**boot VME controllers (100 % done - need ask hostname TS crate )
+
**boot VME controllers (100 % done - need ask hostname TS crate (done) )
 
**TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
 
**TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
 
**detector cabling  
 
**detector cabling  
 
**new MPD production - about to start - FPGA shipped to Paolo -  
 
**new MPD production - about to start - FPGA shipped to Paolo -  
**MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
+
**MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link - working some fibers missing compared to SSP -
 
**MPD being setup  in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )  
 
**MPD being setup  in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )  
**setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver
+
**setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver -
**need to install remote switch for crate in bunker - rest are VXS or VME64 -  
+
**need to install remote switch for crate in bunker - rest are VXS or VME64 - hareboot32 ( done ) 
**Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install
+
**Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install - will add NIM crate - in middle rack
**TS setup - 50 %
+
**TS setup - 50 % -
**Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David )
+
**Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David ) - FADC in scaler crate - for BPM readout 
**HCAL cabling  
+
**HCAL cabling - done
 
**HCAL need power ( done, Berta )
 
**HCAL need power ( done, Berta )
**Mark hodoscope trigger ?
+
**Mark hodoscope trigger ? - need to convert LVDS Or to ECL and bring to SBS bunker - if useful - can ask Armen or Arun for help with making cables
**Computer move to Hall A : sbsdaq1/2/3 tedbbdaq (done ) enpcamsonne ( done ) - need to install X server - Need ask Ole -  
+
**Computer move to Hall A : sbsdaq1/2/3 - (still need to install x server ) -  tedbbdaq (done ) enpcamsonne ( done ) - Need ask Ole -  
**LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run  
+
**LHRS fiber pull ( waiting fiber August 13th ) - need few cables for trigger and L1A - if need fast L1A - for cable - will check latency - latency might be worse with daisy chaining -  might still need to pull a few cables - want at least L1A for scalers - plan to run on 1 of 12 cables Green and DAQ bunker - can run additionnal signals there at the same time
**Cosmics trigger ( Bogdan ? 0 %) -  
+
**Cosmics trigger - Done for Bigbite side
**Cosmics  HCAL
+
**Cosmics  HCAL - Done using overlapping trigger - could use paddles later -
**Cosmics Shower
+
**Cosmics Shower -
**Cosmics Hodoscope
+
**Cosmics Hodoscope -
 
**Test 10 gig link to DAQ to adaq1
 
**Test 10 gig link to DAQ to adaq1
 
**EPICS script -  
 
**EPICS script -  
Line 117: Line 112:
  
 
*Outstanding issues
 
*Outstanding issues
**2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare  ( done )
+
**2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare  ( done ) -
**SD delay : still need 2 SDs ( Glasgow and INFN just requested quote )  
+
**SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) - will borrow two from Hall B
 
**need to adjust for HCAL transit time with different PMTs
 
**need to adjust for HCAL transit time with different PMTs
**status of cosmics paddles ( installed by Bogdan )
+
**status of cosmics paddles ( done )
**GEM fibers too short : Mark will order parts - need to check status of order  
+
**GEM fibers too short : Mark will order parts - need to check status of order - follow up on lead time
**15 bad MPDs - need to look at fixing  - Ben ?  Dustin loaning us 6 MPDs - need 85 total - 67 in hand  - 1 MPD (301) VME address issue in some slot -  
+
**15 bad MPDs - need to look at fixing  - Ben ?  Dustin loaning us 6 MPDs - need 85 total - 67 in hand  - 1 MPD (301) VME address issue in some slot - Ben fixed several MPDs ( 2 or 3 MPDs to be repaired )
***APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
+
***APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir ) - need to ask to Dustin if can borrow
 
**GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
 
**GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
 
**GEM HV IP need setup ( Alex ) Done
 
**GEM HV IP need setup ( Alex ) Done
**GEM clock/trigger box for BB side
+
**GEM clock/trigger box for BB side - ok for BB - need to make sure we have enough for GEn RP -
 +
**would like to put helicity control signals to be recorded on trigger - either TS/TI input bits - 3 signals - need to setup with TI ( I think firmware was updated to work - and will try - if any channels available for FADC- can add those too - could add to BPM/Raster FADC available channels

Latest revision as of 11:47, 20 August 2021

  • Updates
    • HCal
      • analog sum setup using for cosmics
      • DAQ running, can see pulses in data
      • still take a day or so to check out everything
      • can take cosmics to have things set up as in Test Lab
      • software setup
    • Bigbite Shower
      • finished all cabling signal and HV and trigger monitoring, cosmics paddle cabling and labeling
      • scalers : all supplies to make the special cables, need to make sure not to forget remove terminator on scaler
      • can see signal from the cosmics trigger - cosmics
      • mapping check on detector side
      • moving from front end to bunker for mapping check - only one mistake found so far
      • continue checks and turn one layer at a time and look at individual signals
      • HV can be controlled with HV GUI
      • cosmics calibration
      • Mark set up cosmics trigger, if someone need to use it coordinate with Mark
      • cables on table - used to look at trigger rates
      • odd thing with scaler rates : sum much higher than individual sum of channels
      • Provokar will check offset of the analog fan - to see where the threshold can be set
      • Cable for threshold for DAQ - still need to be installed - 50 meters might be long enough for that
    • Bigbite Hodoscope
      • HV just setup thanks to Steve
      • LV : were thinking combined voltage with GRINCH but did not work out to have both for GRINCH and hodoscope, so need another supply, Jack ordered another supply
      • cabling : need extension on TDC cables - next week
      • can start looking at signals straight from PMTs
      • all cables laid out
    • GRINCH
      • good progress
      • GRINCH fully cables
      • HV cables and on
      • checking all signals, 3 BNC head need to be fixed for ADC, most signals look good
      • powered HV incrementally : most TDC channels are working
      • need to replace 2 NINO cards
      • some boards cannot reach 5V
      • hodoscope using older version
      • can use spares - old version found by Rachel - she is shipping it
      • checking mapping of detector
      • scalers display working in the bunker in bbhodo account
      • still need to try to run CODA
    • LHRS
      • Maria working on the PID software
      • looking at target reconstruction
      • Bob still working with Ole on counting house
    • CDet
      • last of optimized resistor in
      • few individual pixels which have smaller than expected amplitude - might need to fix / adjust
      • once all fixed will take cosmics for threshold and efficiencies
    • RF time
    • HV
      • All HV crates are up, except for VME CAEN card in INFN GEM
      • EPICS for HV working
      • if want to try : go to aslow@adaqsc and type gohv
      • GUI for HVs
      • will give infor about HRS to add to the EPICS GUI
    • Scalers
      • progress with scaler
      • scaler server setup - Mark is using to look at rates
      • 4 G0 scalers are working - could use for detector rates - need to make sure width is greater than 20 ns - can be used for monitoring
      • trigger monitor just for rates - will use to monitor trigger rate - check discriminator width
    • EPICS
      • David on site
    • Helicity
      • Paul on site this week , helicity signal patched down to LHRS , and patched down from patch panel to behind the wall, can use to go to SBS crate
      • disconnected the RHRS cables so we can to patch to go to SBS DAQ
      • need 12 cables from DAQ bunker to behind green wall for signals
      • signals connected to helicity scalers : check with standalone program, everything is showing up, still need to integrate code into crl for LHRS
      • minor modifications need for the QWeak helicity class to get it to work with the current system - inside Podd framework - we are using the master version - 1.75 - Paul will add to master - will be used as a plug-in same as usual helicity decoder - might still need to recompile Podd after added
    • start / stop / EPICS scripts
    • GEM
      • Bigbite GEM Hall A
      • took pedestal data with SSP two days ago - UV UVA look as expected -
      • lot of noise compared to TEDF - 20 to 100 ADC in Hall - not sure source - might be grounding and other to be improved
      • trying to find if BigBite can be shielded to see if this improves noise
      • shielding on J3 in Test Lab, but still HV issues to be figured out
      • all fibers working on SSP
      • all UVA chamber to VTP : can get VTP data this morning. Some fibers not showing up. Holly swapped around fibers - but still need to figure out issue
      • INFN : just working on shielding - no DAQ for now
      • received fiber extension - can lay out spares - need to check if we have protective sleeve - most likely 100 feet left - check with Scott
      • UVA  : just testing Bigbite setup
      • might move from cleanroom to TEDF
  • On-going tasks
    • Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) - MPD bunker will move with SBS - ordering longer fiber to take that into account
    • Scaler crate setup (90 % - Steve )- still need to add the CODA part - if add barebone read out - right now scalers at 3800 - helicity scaler set as 3801- could work if stay this way- Steve scan the crate - can make that the scaler is not initialized by Steve program - sbsvme29 - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray (done )- CAEN
    • documentation of VME crate names to power cycle - [[1]]- need to make sure all VXS are in dhcp -Bryan
    • 3 rd GEM VXS crate install router moved up ( 100% )
    • need power and network in GEM bunker ( done )
    • boot VME controllers (100 % done - need ask hostname TS crate (done) )
    • TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
    • detector cabling
    • new MPD production - about to start - FPGA shipped to Paolo -
    • MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link - working some fibers missing compared to SSP -
    • MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )
    • setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver -
    • need to install remote switch for crate in bunker - rest are VXS or VME64 - hareboot32 ( done )
    • Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install - will add NIM crate - in middle rack
    • TS setup - 50 % -
    • Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David ) - FADC in scaler crate - for BPM readout
    • HCAL cabling - done
    • HCAL need power ( done, Berta )
    • Mark hodoscope trigger ? - need to convert LVDS Or to ECL and bring to SBS bunker - if useful - can ask Armen or Arun for help with making cables
    • Computer move to Hall A : sbsdaq1/2/3 - (still need to install x server ) - tedbbdaq (done ) - enpcamsonne ( done ) - Need ask Ole -
    • LHRS fiber pull ( waiting fiber August 13th ) - need few cables for trigger and L1A - if need fast L1A - for cable - will check latency - latency might be worse with daisy chaining - might still need to pull a few cables - want at least L1A for scalers - plan to run on 1 of 12 cables Green and DAQ bunker - can run additionnal signals there at the same time
    • Cosmics trigger - Done for Bigbite side
    • Cosmics HCAL - Done using overlapping trigger - could use paddles later -
    • Cosmics Shower -
    • Cosmics Hodoscope -
    • Test 10 gig link to DAQ to adaq1
    • EPICS script -
    • alarm handler (David)
  • Outstanding issues
    • 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done ) -
    • SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) - will borrow two from Hall B
    • need to adjust for HCAL transit time with different PMTs
    • status of cosmics paddles ( done )
    • GEM fibers too short : Mark will order parts - need to check status of order - follow up on lead time
    • 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot - Ben fixed several MPDs ( 2 or 3 MPDs to be repaired )
      • APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir ) - need to ask to Dustin if can borrow
    • GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
    • GEM HV IP need setup ( Alex ) Done
    • GEM clock/trigger box for BB side - ok for BB - need to make sure we have enough for GEn RP -
    • would like to put helicity control signals to be recorded on trigger - either TS/TI input bits - 3 signals - need to setup with TI ( I think firmware was updated to work - and will try - if any channels available for FADC- can add those too - could add to BPM/Raster FADC available channels