Difference between revisions of "October 1st 2021"

From Hall A Wiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
*Updates
 
*Updates
 
**HCal
 
**HCal
 +
***ROC16  - ROC17 - seems better with fixing the busy
 +
***taking cosmics and looking at LED - 1 LED run and 1 cosmics - most PMT calibrated - some have very long tail ( not light leak - seems linked to PMT - need to investigate and replace or move to edge of acceptance
 
**Bigbite Shower
 
**Bigbite Shower
 +
***one issue with 1 preshower threshold : FADC pedestals needed to be adjusted - Ben has some software
 +
***still running cosmics - calibration almost done
 +
***want to set up the FADC scalers
 
**Hodoscope
 
**Hodoscope
 +
***3 night HV tripped randomly - last night HV did not trip, EPICS server was disabled yesterday
 +
***need take scans with FADC 
 
**GRINCH
 
**GRINCH
 
+
***was trying to take gain matching data
 +
***HV was tripping with LED
 +
***stable now , pulser showing on scaler
 +
***continuing with data collection
 +
***TS not working right now - need TS to get LED trigger - will try to fix
 +
***good statistics LED run - can fit most channels - need continue data taking with different HV
 
**CDet
 
**CDet
 +
***issue : 1 run with very few events recorded - total number of triggers - but no events in ADC / TDC - take data at beginning but stops - after power cycling worked fine - take screen shot of event builder and ROC and put in HALOG
 
**LHRS
 
**LHRS
 +
***pretty much ready - remote power cycling fixed - latency set
 +
***scripts start and end of run : run by hand - still working on tying with CODA
 +
***will work with Maria to cable RF
 
**GEM Bigbite INFN
 
**GEM Bigbite INFN
 +
***taking data every night
 +
***Sean working on FIR coefficient
 +
***working on 4th layer of Bigbite : was working but HV issue , will be tested - aluminized mylar added
 +
***techs working on BigBite water hose - might need to work on evening
 
**UVA clean room
 
**UVA clean room
**GEn RP chamber
+
***finished setting up HV for GEN RP
 +
***Gas system done - gas flowing
 +
***Thir updated all MPD firmware
 +
***Anu working on setting up network - can set up VTP after
 +
***host moved to hall A dev : need to PXE boot from the counting house
 +
**GEn RP chamber : DAQ setup using Hall A system
 
**Helicity
 
**Helicity
 +
***adding config file to be able to enable / disable helicity scaler
 +
***some changes for sbsvme29 readout and will start setting up readout list
 +
***still 120 Hz delayed - should switch to 30 Hz in time when convenient
 
**Beamline/scalers
 
**Beamline/scalers
 +
***cables pulled from bunker to beamline rack : mapping / cabling posted on halog
 +
***copy of BCM in helicity board
 +
***plugging the helicity signals in
 +
***David has couple of spares - that could be used for RF
 +
***could check with Simona : she is using a beam nose patch panel for some moller signals ( 8 )
 +
**HV : restart all GUI - will kill all previous GUI - might have cross-talk between detector
 +
  
 
*On going tasks
 
*On going tasks
**Cable to weldment ( David / Heidi  70%? )
+
**Cable to weldment ( David / Heidi  100%? )
**cabling scaler/beamline crate ( David , Bob 50%)
+
**cabling scaler/beamline crate ( David , Bob 100%)
**HRS to TS and timing ( Bob, Maria 50% )
+
**HRS to TS and timing ( Bob, Maria 50% ) - programmed high threshold for other detectors -
**EPICS / start End of run logging script (Alex, Bob 50%) - need ER for insertion -  
+
**software for FADC pedestals : Bryan will give to Brad
**script check MPD sync ( Ben , Andrew ) -  code to unpack information already written - need run with those data - timestamp need some work
+
**EPICS / start End of run logging script (Alex, Bob 90%) - just need to add configuration - will make a test configuration
**RF (Bob ,Maria ) - located RF prescaler and signal - need to send to HRS and SBS weldment - need add F1 for RF
+
**script check MPD sync ( Ben , Andrew 20%) -  code to unpack information already written - need run with those data - timestamp need some work
 +
**RF (Bob ,Maria ) - located RF prescaler and signal - need to send to HRS and SBS weldment - need add F1 for RF and will send to HCAL spare F1 channels
 
**sync check scripts ( Andrew , Alex 0%)
 
**sync check scripts ( Andrew , Alex 0%)
**EDTM at least 1 Hz for helicity ( Scott, Arun, Mark ? ) Just need to check it is working : look for 10 Hz EDTM - need to put in TDC too
+
**EDTM at least 1 Hz for helicity ( Scott, Arun, Mark ? ) Just need to check it is working : look for 10 Hz EDTM - need to put in TDC too - need help set up library in hodoscope crate - will plug it back and use Scott GUI
 
**Hodoscope v1190 clock ( Alex , Mark , Ralph) - done
 
**Hodoscope v1190 clock ( Alex , Mark , Ralph) - done
***check if calibration is needed after switch - to do but should not be much
+
***check if calibration is needed after switch - to do but should not be much - check with Ben if he as software -
**Full configration all crates ( Alex, Bryan ) - can attach process to components - just finish CODA config
+
**Full configration all crates ( Alex, Bryan - 52.3% ) - can attach process to components - just finish CODA config
 
**need setup screens for online display and analysis, Hall A tools on big screen - can make a map file - (Bryan , done )
 
**need setup screens for online display and analysis, Hall A tools on big screen - can make a map file - (Bryan , done )
 
**data rate test with new computer and 3 VTPs ( Alex, Bryan ) -  
 
**data rate test with new computer and 3 VTPs ( Alex, Bryan ) -  
 
**test GEM zero supression ( Sean, Holly )- done  
 
**test GEM zero supression ( Sean, Holly )- done  
**GEM cosmics ( Sean, Holly )
+
**FIR
**Shower cosmics (Arun, Provokar ) 80 % ?
+
**GEM cosmics ( Sean, Holly ) 70 %
**HCAL cosmics (Scott)  
+
**Shower cosmics (Arun, Provokar ) 90 % ?
**GRINCH cosmics ( Bradley )
+
**HCAL cosmics (Scott) - investigating the issue - most channel working - ~ 80%
**Hodoscope cosmics ( Ralph )
+
**GRINCH cosmics ( Bradley ) - need 3 more runs x 8  - 4 FADC - only 64 out of 550 -
 +
**Hodoscope cosmics ( Ralph ) - calibration TDC and nino thresholds : looks pretty good - just need to look at FADC - upper third, 2 left  - 60%
 
**DAQ documentation ( Alex, Rachel ,Don) ( 10 % resets, need starting CODA / troubleshoooting )
 
**DAQ documentation ( Alex, Rachel ,Don) ( 10 % resets, need starting CODA / troubleshoooting )
 
**suggest taking all detectors cosmics every night - took a few runs !
 
**suggest taking all detectors cosmics every night - took a few runs !
Line 41: Line 78:
 
**add FADCs for shower sum and HODO ( David / Mark /Bryan : done )
 
**add FADCs for shower sum and HODO ( David / Mark /Bryan : done )
 
**add FADCs for GRINCH (Bryan/Alex) - done  
 
**add FADCs for GRINCH (Bryan/Alex) - done  
**read threshold for discriminator from with RPi be Ellen (done), need give code to Steve - could add in logentry or wiki for adding in other scripts
+
**read threshold for discriminator from with RPi be Ellen (done) (noise issue was fixed), need give code to Steve ( done )  - could add in logentry or wiki for adding in other scripts ( check with Steve ) - Scott wanted to add those readback in GUI
 
**scaler gating with TS (Alex, Steve) done ? , need include code in readout list - Steve looking at adding to TS list (done)
 
**scaler gating with TS (Alex, Steve) done ? , need include code in readout list - Steve looking at adding to TS list (done)
 
**MPD crates on hareboot6 (done) - can be power cycled remotely
 
**MPD crates on hareboot6 (done) - can be power cycled remotely
 
** put UVA GEM LV on reboot switch (done)
 
** put UVA GEM LV on reboot switch (done)
 
**(new) Trigger latch TS to TDC ( try F1 ? or add vetroc gem crate )
 
**(new) Trigger latch TS to TDC ( try F1 ? or add vetroc gem crate )
**event type decoding in analyzer
+
**event type decoding in analyzer - ( mention at analysing )
 
+
**MPD retiming (?) with V1495
  
 
*Issues
 
*Issues
**transceiver issues : HCAL TI might be suspicious ROC 17 ( Scott replaced two transceiver but need to test might be bad connection )
+
**transceiver issues : HCAL TI might be suspicious ROC 17 ( Scott replaced two transceiver but need to test might be bad connection )  
*** 1 out of 4 HRS run with TS, if reboot TS usually fixes it
+
*** 1 out of 4 HRS run with TS, if reboot TS usually fixes it -
 
**network issue : one short fiber replaced, will try to put in protective tube
 
**network issue : one short fiber replaced, will try to put in protective tube
 
**LHRS TI : working now
 
**LHRS TI : working now
Line 61: Line 98:
 
**Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - switched to 1190 -  
 
**Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - switched to 1190 -  
 
**Helicity scaler readout : issues working with same DMA configuration - scalers doing regular VME  
 
**Helicity scaler readout : issues working with same DMA configuration - scalers doing regular VME  
**need copy of L1A for helicity scaler - can send TI output ?  done
+
**need copy of L1A for helicity scaler - can send TI output ?  counting L1A between helicity event to track sync -done  
 
**Full config still hanging on LHRS and HCAL busy : no hanging buffer level 2 - need more testing high rate
 
**Full config still hanging on LHRS and HCAL busy : no hanging buffer level 2 - need more testing high rate
 
*use HV EPICS : type go_hv on aslow on adaqsc , need people to check if it works and if mapping is correct
 
*use HV EPICS : type go_hv on aslow on adaqsc , need people to check if it works and if mapping is correct
 
**control system studio try self update and NFS down  
 
**control system studio try self update and NFS down  
**EPICS server need to be started at boot, Ole and Bryan
+
**EPICS server need to be started at boot, Ole and Bryan - ?
 
**can put documentation for other control
 
**can put documentation for other control
 
**(new) ROC17 F1 data - data left at sync event - seems fixed after fixing busy cabling
 
**(new) ROC17 F1 data - data left at sync event - seems fixed after fixing busy cabling
Line 74: Line 111:
 
**(new) deadtime ROC17 HCAL
 
**(new) deadtime ROC17 HCAL
 
**(new) deadtime ROC5 hodoscope
 
**(new) deadtime ROC5 hodoscope
 +
 +
*Hall was cleaned - fibers left and table left
  
 
*Helicity board : 2 avalaible
 
*Helicity board : 2 avalaible

Latest revision as of 11:44, 1 October 2021

  • Updates
    • HCal
      • ROC16 - ROC17 - seems better with fixing the busy
      • taking cosmics and looking at LED - 1 LED run and 1 cosmics - most PMT calibrated - some have very long tail ( not light leak - seems linked to PMT - need to investigate and replace or move to edge of acceptance
    • Bigbite Shower
      • one issue with 1 preshower threshold : FADC pedestals needed to be adjusted - Ben has some software
      • still running cosmics - calibration almost done
      • want to set up the FADC scalers
    • Hodoscope
      • 3 night HV tripped randomly - last night HV did not trip, EPICS server was disabled yesterday
      • need take scans with FADC
    • GRINCH
      • was trying to take gain matching data
      • HV was tripping with LED
      • stable now , pulser showing on scaler
      • continuing with data collection
      • TS not working right now - need TS to get LED trigger - will try to fix
      • good statistics LED run - can fit most channels - need continue data taking with different HV
    • CDet
      • issue : 1 run with very few events recorded - total number of triggers - but no events in ADC / TDC - take data at beginning but stops - after power cycling worked fine - take screen shot of event builder and ROC and put in HALOG
    • LHRS
      • pretty much ready - remote power cycling fixed - latency set
      • scripts start and end of run : run by hand - still working on tying with CODA
      • will work with Maria to cable RF
    • GEM Bigbite INFN
      • taking data every night
      • Sean working on FIR coefficient
      • working on 4th layer of Bigbite : was working but HV issue , will be tested - aluminized mylar added
      • techs working on BigBite water hose - might need to work on evening
    • UVA clean room
      • finished setting up HV for GEN RP
      • Gas system done - gas flowing
      • Thir updated all MPD firmware
      • Anu working on setting up network - can set up VTP after
      • host moved to hall A dev : need to PXE boot from the counting house
    • GEn RP chamber : DAQ setup using Hall A system
    • Helicity
      • adding config file to be able to enable / disable helicity scaler
      • some changes for sbsvme29 readout and will start setting up readout list
      • still 120 Hz delayed - should switch to 30 Hz in time when convenient
    • Beamline/scalers
      • cables pulled from bunker to beamline rack : mapping / cabling posted on halog
      • copy of BCM in helicity board
      • plugging the helicity signals in
      • David has couple of spares - that could be used for RF
      • could check with Simona : she is using a beam nose patch panel for some moller signals ( 8 )
    • HV : restart all GUI - will kill all previous GUI - might have cross-talk between detector


  • On going tasks
    • Cable to weldment ( David / Heidi 100%? )
    • cabling scaler/beamline crate ( David , Bob 100%)
    • HRS to TS and timing ( Bob, Maria 50% ) - programmed high threshold for other detectors -
    • software for FADC pedestals : Bryan will give to Brad
    • EPICS / start End of run logging script (Alex, Bob 90%) - just need to add configuration - will make a test configuration
    • script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work
    • RF (Bob ,Maria ) - located RF prescaler and signal - need to send to HRS and SBS weldment - need add F1 for RF and will send to HCAL spare F1 channels
    • sync check scripts ( Andrew , Alex 0%)
    • EDTM at least 1 Hz for helicity ( Scott, Arun, Mark ? ) Just need to check it is working : look for 10 Hz EDTM - need to put in TDC too - need help set up library in hodoscope crate - will plug it back and use Scott GUI
    • Hodoscope v1190 clock ( Alex , Mark , Ralph) - done
      • check if calibration is needed after switch - to do but should not be much - check with Ben if he as software -
    • Full configration all crates ( Alex, Bryan - 52.3% ) - can attach process to components - just finish CODA config
    • need setup screens for online display and analysis, Hall A tools on big screen - can make a map file - (Bryan , done )
    • data rate test with new computer and 3 VTPs ( Alex, Bryan ) -
    • test GEM zero supression ( Sean, Holly )- done
    • FIR
    • GEM cosmics ( Sean, Holly ) 70 %
    • Shower cosmics (Arun, Provokar ) 90 % ?
    • HCAL cosmics (Scott) - investigating the issue - most channel working - ~ 80%
    • GRINCH cosmics ( Bradley ) - need 3 more runs x 8 - 4 FADC - only 64 out of 550 -
    • Hodoscope cosmics ( Ralph ) - calibration TDC and nino thresholds : looks pretty good - just need to look at FADC - upper third, 2 left - 60%
    • DAQ documentation ( Alex, Rachel ,Don) ( 10 % resets, need starting CODA / troubleshoooting )
    • suggest taking all detectors cosmics every night - took a few runs !
    • add scaler crate to full config ( Alex, Steve )
    • coincidence trigger (done ) - need fine tune inputs at TS
    • BB CAL and HCAL at TS - delayed after coincidence (Mark, done ) - need the RC box for FADC ref channel - need delay single triggers (Mark , done 15 ns ) - add GRINCH LED (done #5) -
    • reference channel to all crates - need HCal and Shower + RF
    • add FADCs for shower sum and HODO ( David / Mark /Bryan : done )
    • add FADCs for GRINCH (Bryan/Alex) - done
    • read threshold for discriminator from with RPi be Ellen (done) (noise issue was fixed), need give code to Steve ( done ) - could add in logentry or wiki for adding in other scripts ( check with Steve ) - Scott wanted to add those readback in GUI
    • scaler gating with TS (Alex, Steve) done ? , need include code in readout list - Steve looking at adding to TS list (done)
    • MPD crates on hareboot6 (done) - can be power cycled remotely
    • put UVA GEM LV on reboot switch (done)
    • (new) Trigger latch TS to TDC ( try F1 ? or add vetroc gem crate )
    • event type decoding in analyzer - ( mention at analysing )
    • MPD retiming (?) with V1495
  • Issues
    • transceiver issues : HCAL TI might be suspicious ROC 17 ( Scott replaced two transceiver but need to test might be bad connection )
      • 1 out of 4 HRS run with TS, if reboot TS usually fixes it -
    • network issue : one short fiber replaced, will try to put in protective tube
    • LHRS TI : working now
    • GEM with TS hanging - real MPD out of sync - fixed with new firmware - (fixed : 5.2 KHz bufferlevel 5)
    • Shower FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority )
    • HCAL FADC bad channel - repaired by Bill - jumper wiggled loose - if no pedestal - could be this jumper (fixed)
    • HCAL ROC16 fiber - will double check if fiber 5 enabled - use slave5 - added additionnal fiber for ROC16 - fixed by cleaning
    • warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
    • Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - switched to 1190 -
    • Helicity scaler readout : issues working with same DMA configuration - scalers doing regular VME
    • need copy of L1A for helicity scaler - can send TI output ? counting L1A between helicity event to track sync -done
    • Full config still hanging on LHRS and HCAL busy : no hanging buffer level 2 - need more testing high rate
  • use HV EPICS : type go_hv on aslow on adaqsc , need people to check if it works and if mapping is correct
    • control system studio try self update and NFS down
    • EPICS server need to be started at boot, Ole and Bryan - ?
    • can put documentation for other control
    • (new) ROC17 F1 data - data left at sync event - seems fixed after fixing busy cabling
    • (new) hodoscope no data in some events - seems fixed after putting busy from distribution board
    • (new) HCAL ROC17 crash / shutdown
    • (new) V1190 stuck at prestart - went away after switch to external clock - maybe bad connection
    • (new) setup network port for UVA chamber testing in EEL 125
    • (new) deadtime ROC17 HCAL
    • (new) deadtime ROC5 hodoscope
  • Hall was cleaned - fibers left and table left
  • Helicity board : 2 avalaible
  • F1 : need to test high rate
  • could increase threshold - window width 1000 ns maybe - need to be optimized - 40 ns - no remote threshold right now - on camac - might be able to control

288 channels = 18 NIM modules