Difference between revisions of "Hadron DAQ re-installation"
From Hall A Wiki
(→Hadron Package DAQ) |
|||
Line 2: | Line 2: | ||
== Hadron Package DAQ == | == Hadron Package DAQ == | ||
+ | |||
+ | * Remove all NIM/CAMAC/VME modules that will not be used. | ||
+ | * Replace Linear FI/FO in second NIM bin. | ||
+ | ** Recable all dE linear sums (L+R) from 50/50 splitters and to CAMAC Discriminators | ||
+ | * Recable all E (dE) from x10 Amplifiers (50/50 splitters) to CAMAC Discriminators | ||
+ | * Verify mapping of E and dE delay line from x10 Amplifiers to VME ADCs. | ||
+ | * Cable E and dE scintillators from Hadron Package to DAQ Weldment Patch Panels | ||
== Neutron Detector DAQ == | == Neutron Detector DAQ == |
Revision as of 19:00, 10 March 2009
Plan/Checklist for Re-Installing the BigBite Hadron DAQ (including Neutron Detector).
Hadron Package DAQ
- Remove all NIM/CAMAC/VME modules that will not be used.
- Replace Linear FI/FO in second NIM bin.
- Recable all dE linear sums (L+R) from 50/50 splitters and to CAMAC Discriminators
- Recable all E (dE) from x10 Amplifiers (50/50 splitters) to CAMAC Discriminators
- Verify mapping of E and dE delay line from x10 Amplifiers to VME ADCs.
- Cable E and dE scintillators from Hadron Package to DAQ Weldment Patch Panels