Difference between revisions of "Online analysis: results and pending"
From Hall A Wiki
(→Matching data taking with run plans) |
|||
Line 4: | Line 4: | ||
=Matching data taking with run plans= | =Matching data taking with run plans= | ||
+ | * Update the how to | ||
* Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged | * Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged | ||
− | + | * Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan | |
+ | * Establish history of the data taking against the boiling test | ||
+ | * Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal | ||
=LHRS commissioning= | =LHRS commissioning= | ||
=DVCS Calorimeter= | =DVCS Calorimeter= |
Revision as of 18:41, 10 October 2010
Back to DVCS
This page is in progress, please contribute to it.
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Establish history of the data taking against the boiling test
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal