Difference between revisions of "Online analysis: results and pending"
From Hall A Wiki
(→LHRS commissioning) |
(→LHRS commissioning) |
||
Line 16: | Line 16: | ||
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]] | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]] | ||
+ | |||
* Calibrate detector time spectra: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | * Calibrate detector time spectra: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | ||
=DVCS Calorimeter= | =DVCS Calorimeter= |
Revision as of 18:46, 10 October 2010
Back to DVCS
This page is in progress, please contribute to it.
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Establish history of the data taking against the boiling test
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
LHRS commissioning
- Calibrate the ADCs:
Still to be done S1, Pion rejector,
[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
- Calibrate detector time spectra: [t0 for VDC (done 10-09)]