Difference between revisions of "Online analysis: results and pending"
From Hall A Wiki
(→LHRS commissioning) |
(→LHRS commissioning) |
||
Line 17: | Line 17: | ||
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]] | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]] | ||
− | * Calibrate detector time spectra: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | + | * Calibrate detector time spectra: |
+ | Still to be done : understand timing spectra for S1,S2 and the Cerenkov | ||
+ | |||
+ | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | ||
=DVCS Calorimeter= | =DVCS Calorimeter= |
Revision as of 18:47, 10 October 2010
Back to DVCS
This page is in progress, please contribute to it.
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Establish history of the data taking against the boiling test
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
LHRS commissioning
- Calibrate the ADCs:
Still to be done S1, Pion rejector,
[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
- Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
[t0 for VDC (done 10-09)]