Difference between revisions of "Online analysis: results and pending"

From Hall A Wiki
Jump to: navigation, search
(LHRS commissioning)
(LHRS commissioning)
Line 18: Line 18:
  
 
=LHRS commissioning=
 
=LHRS commissioning=
* Calibrate the ADCs:
+
== Calibrate the ADCs: ==
 
   
 
   
 
Still to be done S1, Pion rejector,
 
Still to be done S1, Pion rejector,

Revision as of 19:15, 10 October 2010

Back to DVCS

This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.

Matching data taking with run plans

  • Update the how to
  • Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
  • Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal

Luminosity, efficiency

  • Boiling test:
    • Establish history of the data taking against the boiling test
    • Analyze data of the boiling test, conclude
  • Trigger efficiency

Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger

LHRS commissioning

Calibrate the ADCs:

Still to be done S1, Pion rejector,

[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
  • Calibrate detector time spectra:

Still to be done : understand timing spectra for S1,S2 and the Cerenkov

[t0 for VDC (done 10-09)]
  • LHRS optics run (no sieve/sieve)

Ye Zhihong is interested in this analysis)

    • Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
    • Define goals of analysis
    • Carry on analysis (

DVCS Calorimeter