Difference between revisions of "Online analysis: results and pending"
From Hall A Wiki
(→Boiling test) |
|||
(25 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to [[DVCS]] | Back to [[DVCS]] | ||
− | + | This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it. | |
− | = | + | =Matching data taking with run plans= |
+ | * Update the how to | ||
+ | * Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged | ||
+ | * Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal | ||
− | =[[ | + | =Luminosity, efficiency= |
+ | ==Boiling test== | ||
+ | * Establish history of the data taking against the boiling test | ||
+ | * Analyze data of the boiling test, conclude | ||
+ | |||
+ | ==Trigger efficiency== | ||
+ | |||
+ | Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger | ||
+ | |||
+ | =LHRS commissioning= | ||
+ | == Calibrate the ADCs: == | ||
+ | |||
+ | Still to be done S1, Pion rejector, | ||
+ | |||
+ | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]] | ||
+ | |||
+ | == Calibrate detector time spectra:== | ||
+ | Still to be done : understand timing spectra for S1,S2 and the Cerenkov | ||
+ | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | ||
+ | |||
+ | == LHRS optics run (no sieve/sieve)== | ||
+ | Ye Zhihong is interested in this analysis) | ||
+ | |||
+ | ** Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan | ||
+ | ** Define goals of analysis | ||
+ | ** Carry on analysis ( | ||
+ | |||
+ | =DVCS Calorimeter= |
Latest revision as of 19:16, 10 October 2010
Back to DVCS
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.
Contents
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
Luminosity, efficiency
Boiling test
- Establish history of the data taking against the boiling test
- Analyze data of the boiling test, conclude
Trigger efficiency
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger
LHRS commissioning
Calibrate the ADCs:
Still to be done S1, Pion rejector,
[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
[t0 for VDC (done 10-09)]
LHRS optics run (no sieve/sieve)
Ye Zhihong is interested in this analysis)
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Define goals of analysis
- Carry on analysis (