Line 7: Line 7:
 
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101015154816.html Run Plan for Friday 15 DAY -> Saturday 16 DAY]]<br>
 
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101015154816.html Run Plan for Friday 15 DAY -> Saturday 16 DAY]]<br>
 
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101014115143.html Run Plan for Thurs 14 DAY -> Friday 15 DAY]]: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101015000041.html 10-14 swing ]],[[http://www.jlab.org/~adaq/halog/html/1010_archive/101015080431.html 10-15 owl]],[[http://www.jlab.org/~adaq/halog/html/1010_archive/101015155428.html 10-15 day]]<br>
 
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101014115143.html Run Plan for Thurs 14 DAY -> Friday 15 DAY]]: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101015000041.html 10-14 swing ]],[[http://www.jlab.org/~adaq/halog/html/1010_archive/101015080431.html 10-15 owl]],[[http://www.jlab.org/~adaq/halog/html/1010_archive/101015155428.html 10-15 day]]<br>
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101013183853.html  Run Plan for  Wed 13 SWING -> Thurs 14 DAY]]<br>
+
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101013183853.html  Run Plan for  Wed 13 SWING -> Thurs 14 DAY]]: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101014090245.html 10-14 owl]]<br>
 
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101012174256.html  Run Plan for Tues 12 SWING -> Wed 13 DAY]]<br>
 
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101012174256.html  Run Plan for Tues 12 SWING -> Wed 13 DAY]]<br>
  

Revision as of 23:28, 15 October 2010

Back to DVCS

summary run for optics


Brad Sawatzky
[Run Plan for Friday 15 DAY -> Saturday 16 DAY]
[Run Plan for Thurs 14 DAY -> Friday 15 DAY]: [10-14 swing ],[10-15 owl],[10-15 day]
[Run Plan for Wed 13 SWING -> Thurs 14 DAY]: [10-14 owl]
[Run Plan for Tues 12 SWING -> Wed 13 DAY]

Seamus Riordan

[Run Plan for Swing 10/10 through Day 10/11]
[Run Plan for Swing 10/7 through Day 10/8, plans into next week]
[Run Plan for Swing 10/6 through Day 10/7]
[Run Plan for Swing 10/5 through Day 10/6]
[Run Plan for Swing 10/4 through Day 10/5]
[Run Plan for Swing 10/3 through Day 10/4]
[Run Plan for Swing 10/2 - Day 10/3]

Start up run plan: plans for the very beginning of the data taking, data that can be taken without LHRS and cryo target.


Friday Oct 1 Swing and Oct 2 Owl

  1. Check beam on target (experts will do this)
  2. Lumi tests (Kalyan will do this: page number 357-1057)
  3. Compton rates with laser and beam scan (Eric will lead this study in the backroom)
  4. While Compton study takes place, take HRS cosmics data (CODA configuration: LeftHRS). Replay the data and page expert if something looks wrong
  5. BPM calibration
  6. Raster calibration
  7. Go to empty target (you should already be there!), and call MCC to let them know we don't want beam anymore (they will run some tests of their own then). You're free to go...

In case of problems, page Carlos (584-0049) or call Run Coordinator.