Difference between revisions of "BigBite Production List"

From Hall A Wiki
Jump to: navigation, search
(Raw Production Run Lists)
m (Helicity/Target Spin Breakdown)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
==Helicity/Target Spin Breakdown==
 
==Helicity/Target Spin Breakdown==
  
===4.7 GeV===
+
===4.7 GeV (beam NOT long. pol.)===
 +
1748-1768, 1770-1776, 1779-1792, 1795-1800, 1811-1812, 1817-1823
 +
 
 +
===4.7 GeV (long. pol. beam)===
 
'''Negative Polarity'''
 
'''Negative Polarity'''
 
* Target Spin = 0 Degrees
 
* Target Spin = 0 Degrees

Latest revision as of 13:37, 21 September 2012


Helicity/Target Spin Breakdown

4.7 GeV (beam NOT long. pol.)

1748-1768, 1770-1776, 1779-1792, 1795-1800, 1811-1812, 1817-1823

4.7 GeV (long. pol. beam)

Negative Polarity

Positive Polarity

5.9 GeV

(Posted by Matt Posik)

Negative Polarity

(Posted by Diana Parno)

Target Spin IHWP Status Beam Helicity vs Helicity Signal Production Run Range
90 out same 1530-1534, 1542-1548, 1550-1553
90 in opposite 1535, 1537-1540
270 out same 1311-1314, 1358-1362, 1364, 1369-1373, 1375-1382, 1384-1388, 1402-1403, 1411-1417, 1420, 1423-1427, 1429-1434, 1437-1447, 1449-1456, 1458, 1460, 1463-1466, 1468-1469, 1479-1490, 1492-1494, 1496-1499, 1506-1509

There's a question about the target spin orientation after Run 1498. Checking with Yi. -Diana