Difference between revisions of "G2p Safety Readiness Review"

From Hall A Wiki
Jump to: navigation, search
(New page: ==January 17, 2012 Saftey Readiness Review == '''JLab F113, 1:00-5:00 pm {|border=1 |-bgcolor=Grey ! Topic ! Presenter |- | Welcome and Introduction | J. P. Chen |- | Polarize...)
 
(Overview)
 
(121 intermediate revisions by the same user not shown)
Line 1: Line 1:
==January 17, 2012 Saftey Readiness Review ==
+
==Overview==
 +
On January 17, JLab reviewed the readiness of E08-027/007 to safely begin production data taking.  This wikipage is the central repository of all collaboration information relevant to this review. The official charge is [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/charge/review_charge_g2p-GEp_2011_20111017.doc here].  In addition, the committee  asked us to address [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/charge/questions.txt these specific questions].
  
'''JLab F113,  1:00-5:00 pm
+
 
 +
The review comments and the collaboration response are [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/charge/committee_comments.pdf here]
 +
*(updated 2/8/2012: Interlock schematic).
 +
*(updated 2/10/2012: Radiation damage to Septa epoxy).
 +
 
 +
==Review Agenda ==
 +
 
 +
'''January 17, 2012; JLab <B>F225</B>,  1:00-5:00 pm
 
{|border=1
 
{|border=1
 
|-bgcolor=Grey
 
|-bgcolor=Grey
 +
  ! Time
 
   ! Topic  
 
   ! Topic  
 
   ! Presenter
 
   ! Presenter
 
|-
 
|-
   |  Welcome and Introduction
+
  | 1:00 - 1:20
 +
   |  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/jpchen.ppt Introduction/Overview]
 
   | J. P. Chen
 
   | J. P. Chen
 
|-
 
|-
|  Polarized Target
+
| 1:20 - 1:40
 +
[http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/CKeithReadiness.pdf Polarized Target update] ([http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/g2p_Target_update.pdf short-note])
 
   | C. Keith
 
   | C. Keith
 
|-
 
|-
   | Hall A Beamline
+
   | 1:40 - 2:00
 +
  | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Michalski.pptx g2p/GEp Beamline]
 
   | T. Michalski
 
   | T. Michalski
 
|-
 
|-
   |  Beamline Commissioning
+
  | 2:00 - 2:20
 +
   |  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Roblin.pptx Beamline]  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Roblin_runorbits-nov22.xlsx runorbits]
 
   | Y. Roblin
 
   | Y. Roblin
 
|-
 
|-
   |  Engineering, Design & Field Mapping
+
  | 2:20 - 3:00
 +
  | Break
 +
  |
 +
|-
 +
  | 3:00 - 3:20
 +
   |  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Wines.ppt Engineering, Design & Field Mapping]
 
   | R. Wines
 
   | R. Wines
 
|-
 
|-
   | Hall A Installation, Mechanical Structures ([http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/Folts.pptx talk] [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/G2P_installation_working_update_2_post_target_repair.pdf timeline])
+
   | 3:20 - 3:40
 +
  | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Folts.pptx Hall A Installation, Mechanical Structures]  
 
   | E. Folts
 
   | E. Folts
 
|-
 
|-
   | Radiation Control
+
   | 3:40 - 4:00
 +
  |  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Degtiarenko.pdf Radiation Control]
 
   | P. Degtiarenko
 
   | P. Degtiarenko
 
|-
 
|-
   |  Radiation Control
+
  | 4:00 - 4:20
 +
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Kharashvili_update.pptx Radiation Damage] (updated 1/27/2012) [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Dose_rates.pptx Dose Rates from Local Dump]
 
   | G. Kharashvili  
 
   | G. Kharashvili  
 
|-
 
|-
   |  Experiment Preparation
+
  | 4:20 - 4:40
 +
   |  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Slifer_g2rr_2012_01-17.ppt Experiment Preparation]
 
   | K. Slifer
 
   | K. Slifer
 +
|-
 +
  |4:40 - 5:00
 +
  | Discussion
 +
  |
 
|}
 
|}
  
==Charge==
 
The official [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/review_charge_g2p-GEp_2011_20111017.doc charge].  The committee has also asked us to address [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/questions.txt these specific questions].
 
  
Note to Presenters: Please send your presentation and supporting documents to slifer@jlab.org (or alternatively post them on the CUE at 
 
/u/group/halla/www/hallaweb/html/experiment/g2p/meetings/safety_102411 ).  All material will then be viewable [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/ here]
 
  
==Documentation==
+
All Safety Documentation is [https://hallaweb.jlab.org/wiki/index.php/G2p_documentation here]
The experimental documentation is posted [https://hallaweb.jlab.org/wiki/index.php/G2p_documentation here].
+

Latest revision as of 14:52, 10 February 2012

Overview

On January 17, JLab reviewed the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee asked us to address these specific questions.


The review comments and the collaboration response are here

  • (updated 2/8/2012: Interlock schematic).
  • (updated 2/10/2012: Radiation damage to Septa epoxy).

Review Agenda

January 17, 2012; JLab F225, 1:00-5:00 pm

Time Topic Presenter
1:00 - 1:20 Introduction/Overview J. P. Chen
1:20 - 1:40 Polarized Target update (short-note) C. Keith
1:40 - 2:00 g2p/GEp Beamline T. Michalski
2:00 - 2:20 Beamline runorbits Y. Roblin
2:20 - 3:00 Break
3:00 - 3:20 Engineering, Design & Field Mapping R. Wines
3:20 - 3:40 Hall A Installation, Mechanical Structures E. Folts
3:40 - 4:00 Radiation Control P. Degtiarenko
4:00 - 4:20 Radiation Damage (updated 1/27/2012) Dose Rates from Local Dump G. Kharashvili
4:20 - 4:40 Experiment Preparation K. Slifer
4:40 - 5:00 Discussion


All Safety Documentation is here