This is the run plan for transversity experiment
 
This is the run plan for transversity experiment
  
== Pre-experiment checklists, should be done by Oct. 1st, 2008 ==
+
== Pre-beam checklists [http://hallaweb.jlab.org/experiment/transversity/wikifile/prebeam_checklist_101608.txt txt file updated on 10/21/2008] ==
=== All sub-system's pre-run check list saved in here ===
+
=== [[Transversity/pre-beam checklist|All sub-system's pre-beam check list saved in here]] ===
  
=== Over all Transversity pre-beam checklist  
+
[[Transversity/pre-beam checklist|Overall Transversity pre-beam checklist as of 07/21/2008]].
[http://hallaweb.jlab.org/experiment/transversity/wikifile/prebeam_checklist_072108.txt, Xiaodong Jiang's txt file as of 07/23/2008] ===
+
  
 
== Hall A floor plan layout for Transversity/d2n ==
 
== Hall A floor plan layout for Transversity/d2n ==
  
== Commissioning run plan ==
+
== Run plan ==
  
[[Transversity Run Plan 1st Order#Commissioning Part|1st order run plan, Commissioning Part]]
+
== NEW as of 11/18/08: Production Run Plan, Xiaodong Jiang ==
  
== Production run plan ==
+
Production, basic principles.
  
[[Transversity Run Plan 1st Order#Production part|1st order run plan, Production part]]
+
    Production, target transversely polarized, in-plane left/right and verticle up/down.
 +
    And, reference cell runs H2 gas 110 psi, when plarized He3 cell need a recovery time.
  
== Switch over to d2n ==
+
    Keep doing production runs as much as possible, limit controlled access whenever possible.
 +
    Keep all HV and low-voltage settings and magnet settings stable. All changes need run coordinator's
 +
    explicit approval.
 +
 
 +
    BigBite gas Cherenkov, left arm RICH detector, and Compton related activities in the Hall
 +
    should only happen during a planned down time.
 +
 
 +
    Basic principles guiding the decisions for production run, changes include:
 +
 +
    i. HRS_L polarity change, equally split time between HRS_positive and HRS_negative polarity
 +
        Set HRS_left to 2.35 GeV/c.
 +
 
 +
    ii. Beam half-wave plate IN/OUT changes, equally split.
 +
        Need to coordinate with Hall B.
 +
 
 +
  iii. Moller measurement every week (or after major injector change).
 +
        Prefer two back-to-back Moller measurements before/after the beam half wave plate changes.
 +
 
 +
    iv. Whenever the polarized target is down or need a recovery, run reference cell H2 gas 110 psi,
 +
        With the same configuration (and keep the same prescale factors) .
 +
 
 +
        The "true target-spin-flip" should be turned off to prevent target polarization loss.
 +
        However, the "Real-fake" target spin flip signal should be ON for false asymmetry measurements.
 +
 
 +
        A run on BeO target (same as carbon multifoil), 10 minutes, should be taken once every two days,
 +
        to verify tracking reconstruction (take all T5, 100-200 Hz T3 and T1 and T6, dead time doesn't matter). 
 +
       
 +
    v. Special runs on continous commissioning of BB Cherenkov, left-arm RICH, etc can be taken once
 +
        (or maybe twice)  daily, 10-15 minutes each.  This activity should be well coordinated, prefer to be
 +
        during the polarized target's down time. Run coordinator's explicit approval is needed.
 +
 
 +
 
 +
Day-to-day run plan, 11/18/2008, 11:00am,
 +
 
 +
    1. Reestablish beam position after target movement failar.
 +
 
 +
    2. Start polarized He3-cell production run, 12 uA beam,
 +
        Target spin orientation: Transvers-in-plan, same as during the last week.
 +
 
 +
    3. Around 6:00pm or so, when target experts recovered:
 +
        Rotate target spin to: vertical up-down. Target laser need to be re-configured, target polarization
 +
        need to be measured before and after.
 +
 
 +
        During this time,  we can run reference cell with H2 gas 110 psi, with the same configuration as in
 +
        production (and keep the same prescale factors) .  The "true target-spin-flip" should be turned off
 +
        to prevent target polarization loss. However, the "Real-fake" target spin flip signal should be ON for
 +
        false asymmetry measurements.
 +
 
 +
        The nominal beam position on the reference cell need to be checked (and established), the procedure
 +
        should be:
 +
 
 +
        i. Move target to reference cell, run a lower current, 1uA or 2 uA.
 +
          With the regular BPM position, regular raster setting (3*4 by MCC), record the scaler rates.
 +
 
 +
      ii. Change raster size, to 5*5, and 6*6 (MCC setting) record scaler rates.
 +
          If the scaler rates do not shot up dramatically, then it is fine, we are not hitting the cell walls.
 +
 
 +
          Otherwise, we need to move the beam around by the same offsets in BPMA and BPMB until a spot can be
 +
          found where the rates are stable for different raster settings.
 +
 
 +
          Record the final BPM positions for bothe A and B. This is our reference cell production spot setting.
 +
 
 +
    4. After the target spin rotation is completed, return back to production, 12 uA beam.
 +
        Same running condition, prescale factors as during the day.
 +
 
 +
    5. Keep production, watch out for target spin-flip and monitor target polarization.
 +
 
 +
 
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/run_plan_102508.txt updated txt file on 10/25/08]
 +
 
 +
[[Wiki run plan]]
 +
 
 +
[[RICH commisionning plan]]
 +
 
 +
[[Compton commisionning plan]]
 +
 
 +
 
 +
[[Current issues]]
 +
 
 +
 
 +
[[Current short term run plan]]

Latest revision as of 12:57, 18 November 2008

This is the run plan for transversity experiment

Pre-beam checklists txt file updated on 10/21/2008

All sub-system's pre-beam check list saved in here

Overall Transversity pre-beam checklist as of 07/21/2008.

Hall A floor plan layout for Transversity/d2n

Run plan

NEW as of 11/18/08: Production Run Plan, Xiaodong Jiang

Production, basic principles.
    Production, target transversely polarized, in-plane left/right and verticle up/down.
    And, reference cell runs H2 gas 110 psi, when plarized He3 cell need a recovery time.
    Keep doing production runs as much as possible, limit controlled access whenever possible.
    Keep all HV and low-voltage settings and magnet settings stable. All changes need run coordinator's
    explicit approval.
    BigBite gas Cherenkov, left arm RICH detector, and Compton related activities in the Hall
    should only happen during a planned down time.
    Basic principles guiding the decisions for production run, changes include:

    i. HRS_L polarity change, equally split time between HRS_positive and HRS_negative polarity
       Set HRS_left to 2.35 GeV/c.
   ii. Beam half-wave plate IN/OUT changes, equally split. 
       Need to coordinate with Hall B.
  iii. Moller measurement every week (or after major injector change).
       Prefer two back-to-back Moller measurements before/after the beam half wave plate changes.
   iv. Whenever the polarized target is down or need a recovery, run reference cell H2 gas 110 psi,
       With the same configuration (and keep the same prescale factors) . 
       The "true target-spin-flip" should be turned off to prevent target polarization loss. 
       However, the "Real-fake" target spin flip signal should be ON for false asymmetry measurements.
       A run on BeO target (same as carbon multifoil), 10 minutes, should be taken once every two days,
       to verify tracking reconstruction (take all T5, 100-200 Hz T3 and T1 and T6, dead time doesn't matter).  
       
    v. Special runs on continous commissioning of BB Cherenkov, left-arm RICH, etc can be taken once
       (or maybe twice)  daily, 10-15 minutes each.  This activity should be well coordinated, prefer to be
       during the polarized target's down time. Run coordinator's explicit approval is needed.


Day-to-day run plan, 11/18/2008, 11:00am,
    1. Reestablish beam position after target movement failar.
    2. Start polarized He3-cell production run, 12 uA beam, 
       Target spin orientation: Transvers-in-plan, same as during the last week.
    3. Around 6:00pm or so, when target experts recovered:
       Rotate target spin to: vertical up-down. Target laser need to be re-configured, target polarization 
       need to be measured before and after. 
       During this time,  we can run reference cell with H2 gas 110 psi, with the same configuration as in
       production (and keep the same prescale factors) .  The "true target-spin-flip" should be turned off 
       to prevent target polarization loss. However, the "Real-fake" target spin flip signal should be ON for 
       false asymmetry measurements.
       The nominal beam position on the reference cell need to be checked (and established), the procedure
       should be:
       i. Move target to reference cell, run a lower current, 1uA or 2 uA.
          With the regular BPM position, regular raster setting (3*4 by MCC), record the scaler rates.
      ii. Change raster size, to 5*5, and 6*6 (MCC setting) record scaler rates.
          If the scaler rates do not shot up dramatically, then it is fine, we are not hitting the cell walls.
          Otherwise, we need to move the beam around by the same offsets in BPMA and BPMB until a spot can be 
          found where the rates are stable for different raster settings.
          Record the final BPM positions for bothe A and B. This is our reference cell production spot setting.
    4. After the target spin rotation is completed, return back to production, 12 uA beam.
       Same running condition, prescale factors as during the day.
    5. Keep production, watch out for target spin-flip and monitor target polarization. 


updated txt file on 10/25/08