Difference between revisions of "Thursday, July 2, 2015 1:00pm EDT"

From Hall A Wiki
Jump to: navigation, search
(New page: Previous meeting: Thursday, June 18, 2015 1:00pm EDT * Shielding * Al Background * Optical detector simulations - All * Detector Geometry and Background Studies == Minutes == <br><...)
 
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
Previous meeting: [[Thursday, June 18, 2015 1:00pm EDT]]
 
Previous meeting: [[Thursday, June 18, 2015 1:00pm EDT]]
  
* Shielding
+
* Shielding - Rupesh [http://ace.phys.virginia.edu/MollerSpectrometer/348] using a proper total energy deposition scheme
* Al Background
+
* Al Background - Ciprian [https://hallaweb.jlab.org/wiki/images/f/f0/150702_AlSimCGal.pdf Slides]
 
* Optical detector simulations - All
 
* Optical detector simulations - All
* Detector Geometry and Background Studies
+
* Detector Geometry and Background Studies- [[Image:DetectorGeometryRemoll.pdf]]
  
 
== Minutes ==
 
== Minutes ==

Latest revision as of 12:52, 2 July 2015

Previous meeting: Thursday, June 18, 2015 1:00pm EDT

  • Shielding - Rupesh [1] using a proper total energy deposition scheme
  • Al Background - Ciprian Slides
  • Optical detector simulations - All
  • Detector Geometry and Background Studies- File:DetectorGeometryRemoll.pdf

Minutes



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005