Difference between revisions of "Monday, October 19, 2015, 11:00am EDT - Compton"
From Hall A Wiki
(One intermediate revision by one other user not shown) | |||
Line 25: | Line 25: | ||
=== Electron detector === | === Electron detector === | ||
* Updates from JLab (Hoskins/Camsonne) | * Updates from JLab (Hoskins/Camsonne) | ||
− | * Updates from Manitoba | + | * Updates from Manitoba [https://hallaweb.jlab.org/dvcslog/compton/372 elog 372] |
=== Photon Detector === | === Photon Detector === | ||
Line 35: | Line 35: | ||
== Minutes == | == Minutes == | ||
+ | (transcribed by DG) | ||
+ | * Juliette asks about schedule for the fall. Ciprian (via PQB meeting) says expectation is lots of time on setup before Thanksgiving. Maybe some useful running after that? | ||
+ | * Photon Detector | ||
+ | ** Gregg is on the way to JLab with photon detector - he indicated some problem with the FADC. We have spares if something is broken. | ||
+ | ** Photon detector survey on Thursday - we have this week and next week to hook up detector and check DAQ. | ||
+ | * Electron Detector | ||
+ | ** Alexandre will be working on edet in the hall. Needs to be re-installed by ealry next week for pumpdown. | ||
+ | ** Josh has a large box to hold the detector plane and transition board. This will allow us to safely connect to HV. | ||
+ | ** Ryan and Juliette showed some scope traces from QWADs in Manitoba. Long story short - it's difficult to look at the differential LVDS signals without the proper probe or translation board. I spoke Juliette later, and I'm convinced their seeing real differential output from the board. | ||
+ | * Fall run | ||
+ | ** Dave will start a run plan, and then circulate to the group for comment/additions. |
Latest revision as of 14:13, 19 October 2015
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Agenda
Meeting room=F226 in Cebaf Center
General
- Ed Folts says be ready for lockup by November 1
- Photon detector survey October 22
- Probably need to start pumping on electron detector by Monday, October 26
- Run Plan brainstorming
DAQ
- CMU DAQ - ready for beam?
Electron detector
- Updates from JLab (Hoskins/Camsonne)
- Updates from Manitoba elog 372
Photon Detector
- Analysis of test run data
- Lead-tungstate work at CMU
Laser
- Playing with optimization of laser polarization scheme (photodiodes instead of power meters)
Minutes
(transcribed by DG)
- Juliette asks about schedule for the fall. Ciprian (via PQB meeting) says expectation is lots of time on setup before Thanksgiving. Maybe some useful running after that?
- Photon Detector
- Gregg is on the way to JLab with photon detector - he indicated some problem with the FADC. We have spares if something is broken.
- Photon detector survey on Thursday - we have this week and next week to hook up detector and check DAQ.
- Electron Detector
- Alexandre will be working on edet in the hall. Needs to be re-installed by ealry next week for pumpdown.
- Josh has a large box to hold the detector plane and transition board. This will allow us to safely connect to HV.
- Ryan and Juliette showed some scope traces from QWADs in Manitoba. Long story short - it's difficult to look at the differential LVDS signals without the proper probe or translation board. I spoke Juliette later, and I'm convinced their seeing real differential output from the board.
- Fall run
- Dave will start a run plan, and then circulate to the group for comment/additions.