Difference between revisions of "Monday, October 19, 2015, 11:00am EDT - Compton"

From Hall A Wiki
Jump to: navigation, search
 
(One intermediate revision by one other user not shown)
Line 25: Line 25:
 
=== Electron detector ===
 
=== Electron detector ===
 
* Updates from JLab (Hoskins/Camsonne)
 
* Updates from JLab (Hoskins/Camsonne)
* Updates from Manitoba
+
* Updates from Manitoba [https://hallaweb.jlab.org/dvcslog/compton/372 elog 372]
  
 
=== Photon Detector ===
 
=== Photon Detector ===
Line 35: Line 35:
  
 
== Minutes ==
 
== Minutes ==
 +
(transcribed by DG)
 +
* Juliette asks about schedule for the fall. Ciprian (via PQB meeting) says expectation is lots of time on setup before Thanksgiving. Maybe some useful running after that?
 +
* Photon Detector
 +
** Gregg is on the way to JLab with photon detector - he indicated some problem with the FADC. We have spares if something is broken.
 +
** Photon detector survey on Thursday - we have this week and next week to hook up detector and check DAQ.
 +
* Electron Detector
 +
** Alexandre will be working on edet in the hall. Needs to be re-installed by ealry next week for pumpdown.
 +
** Josh has a large box to hold the detector plane and transition board. This will allow us to safely connect to HV.
 +
** Ryan and Juliette showed some scope traces from QWADs in Manitoba. Long story short - it's difficult to look at the differential LVDS signals without the proper probe or translation board. I spoke Juliette later, and I'm convinced their seeing real differential output from the board.
 +
* Fall run
 +
** Dave will start a run plan, and then circulate to the group for comment/additions.

Latest revision as of 14:13, 19 October 2015

*********BLUEJEANS CALL-IN INSTRUCTIONS*********
----------------------------------------------------
1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada)
2. International participants dial:
Toll Number: 1-408-740-7256
3. Enter meeting ID:140287970

Desktop sharing:
https://bluejeans.com/140287970 

Agenda

Meeting room=F226 in Cebaf Center

General

  • Ed Folts says be ready for lockup by November 1
  • Photon detector survey October 22
  • Probably need to start pumping on electron detector by Monday, October 26
  • Run Plan brainstorming

DAQ

  • CMU DAQ - ready for beam?

Electron detector

  • Updates from JLab (Hoskins/Camsonne)
  • Updates from Manitoba elog 372

Photon Detector

  • Analysis of test run data
  • Lead-tungstate work at CMU

Laser

  • Playing with optimization of laser polarization scheme (photodiodes instead of power meters)

Minutes

(transcribed by DG)

  • Juliette asks about schedule for the fall. Ciprian (via PQB meeting) says expectation is lots of time on setup before Thanksgiving. Maybe some useful running after that?
  • Photon Detector
    • Gregg is on the way to JLab with photon detector - he indicated some problem with the FADC. We have spares if something is broken.
    • Photon detector survey on Thursday - we have this week and next week to hook up detector and check DAQ.
  • Electron Detector
    • Alexandre will be working on edet in the hall. Needs to be re-installed by ealry next week for pumpdown.
    • Josh has a large box to hold the detector plane and transition board. This will allow us to safely connect to HV.
    • Ryan and Juliette showed some scope traces from QWADs in Manitoba. Long story short - it's difficult to look at the differential LVDS signals without the proper probe or translation board. I spoke Juliette later, and I'm convinced their seeing real differential output from the board.
  • Fall run
    • Dave will start a run plan, and then circulate to the group for comment/additions.